Data processing method for engineering project progress and output value linkage

A technology for data processing and engineering projects, which is applied in data processing applications, special data processing applications, and other database retrievals, etc. It can solve the problems that the completion rate of the project progress is not reached, the progress of the construction cannot be correctly reflected, and cannot be investigated, etc., to achieve Avoid project delays and cost overruns, shorten project duration, and avoid unclear rights and responsibilities

Pending Publication Date: 2021-01-22
杭州新中大科技股份有限公司
View PDF8 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] As the output value of engineering projects gradually increases, the number of projects increases, the management area expands, and the project volume of the project department increases. In addition to the need for construction and production, it is necessary to collect relevant data of the project offline and enter the system manually for data verification. Manual engineering The amount is huge and difficult to control in a unified manner, especially for progress and output value control, which is not optimistic in some small and medium-sized construction enterprises. The construction progress is often not correctly reflected in the output value plan and monthly output value report, resulting in inaccurate budgets and costs. comparison, the construction enterprise cannot get the ideal project progress payment
[0003] At present, the progress management system on the market has been sufficiently perfect in terms of progress control, and the progress of the project can be seen intuitively by referring to the bar diagram and the network diagram, but there are still the following problems: the bill of quantities used as the project budget, the import of quota data In the system, it is impossible to form a direct or indirect relationship with the schedule data, resulting in the inability to automatically calculate the completed engineering quantity and the actual output value of the project based on the completed schedule data; there is no standard between the bill of quantities and the project data based on the work breakdown structure Coding requires manual data matching, resulting in an increase in the amount of later projects; the budget data and progress data are prepared by the budget department and the technical department respectively, and there is no associated data between the two data, and because they are managed by different departments, the progress There is no comparability between production value and production value. Even if the offline comparison is carried out manually, the comparison project is relatively large. When problems are found, the rights and responsibilities cannot be investigated; during the construction process, since the progress and production value are reported by different departments, It often happens that the completion rate of the actual project progress is far from the reported output value, that is, the bad behavior of false reporting and concealment; the project department cannot obtain the project output based on the actual completed progress data, that is, the output value data, and then cannot accurately match the cost Through data comparison, the real project benefits, profits, and taxes can be obtained. Therefore, in view of the above problems, it is urgent to design a data processing method for the linkage of project progress and output value to meet the needs of actual use.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Data processing method for engineering project progress and output value linkage
  • Data processing method for engineering project progress and output value linkage
  • Data processing method for engineering project progress and output value linkage

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0043] It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

[0044] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but not as a limitation of the present invention.

[0045] The invention provides a data processing method for the linkage of engineering project schedule output va...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a data processing method for engineering project progress and output value linkage, which belongs to the field of progress and output value data processing, and comprises the following steps of: matching structure nodes of a project and engineering quantity list codes corresponding to the structure nodes, and generating structure node data with codes; forming engineering quantity budget data according to the structure node data and the project budget data; determining a completed engineering quantity according to the actual progress data and the engineering quantity budget data; automatically back-stepping and calculating output value data according to the completed engineering quantity; and carrying out output value analysis, and carrying out monitoring and early warning on the cost risk of projects. The invention has the beneficial effects that the completed engineering quantity is calculated according to the actual progress data, then the output value data iscalculated through automatic back-stepping, and the output value data is generated through progress data linkage, so that the situations of false report and concealment report are avoided. the engineering quantity list and the progress data are intelligently match structure nodes, and maintenance engineering quantity is reduced.

Description

technical field [0001] The invention relates to the field of data processing of schedule output value, in particular to a data processing method for linkage of engineering project schedule output value. Background technique [0002] As the output value of engineering projects gradually increases, the number of projects increases, the management area expands, and the project volume of the project department increases. In addition to the need for construction and production, it is necessary to collect relevant data of the project offline and enter the system manually for data verification. Manual engineering The amount is huge and difficult to control in a unified manner, especially for progress and output value control, which is not optimistic in some small and medium-sized construction enterprises. The construction progress is often not correctly reflected in the output value plan and monthly output value report, resulting in inaccurate budgets and costs. The comparison betw...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10G06F16/903
CPCG06Q10/0635G06Q10/103G06F16/903
Inventor 王平李伯鸣韩爱生金梦笔洪鹏
Owner 杭州新中大科技股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products