Constructional engineering management video acquisition device
A technology for video capture device and construction engineering, which is applied in the direction of TV, color TV, closed-circuit TV system, etc., can solve the problem of user inconvenience and cannot capture scenes in a larger range, and achieve the effect of capturing and all-round capturing.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] see Figure 1~3 , in an embodiment of the present invention, a construction project management video acquisition device includes a mounting plate 1, a rotating column 2 is movably installed on the upper side of the mounting plate 1 through a bearing seat, and a fixing plate 3 is fixedly installed on the upper end of the rotating column 2 , the left end of the fixed plate 3 is hinged with a movable plate 4 through a hinge, and a camera 5 is detachably installed on the upper side of the movable plate 4; a bracket 6 is fixedly installed on the right side of the upper surface of the mounting plate 1, and the bracket 6 The lower side of the horizontal plate is fixedly equipped with a cylinder 7, and the extended end of the cylinder 7 is fixedly connected with an L-shaped strut 8, and the cross bar and the vertical bar forming the L-shaped strut 8 are movably connected; the movable plate 4 The lower side is fixedly equipped with a first slide rail 9, and the end of the L-shap...
Embodiment 2
[0030] see figure 1 In order to make the construction project management video acquisition device of the present invention have the function of energy saving and environmental protection, this embodiment has been further improved on the basis of embodiment 1. The improvement is: the energy saving mechanism includes a horizontal The vertical board 23 on the upper side of the board, the upper end of the vertical board 23 is hinged with a vertical board 22, the lower side of the vertical board 22 is fixedly installed with the second slide rail 25, and the upper side of the horizontal board of the support 6 is fixedly installed with an electric telescopic Cylinder 24 , the extended end of the electric telescopic cylinder 24 is fixedly connected with a second slider 26 slidably arranged in the second slide rail 25 .
[0031] The working principle of the present invention is:
[0032] When using the construction project management video acquisition device of the present invention, ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


