Integrated electricity consumption increase prediction method and device combined with high-frequency influence factors
A technology of influencing factors and high-frequency influence, applied in the field of integrated electricity consumption growth forecast, which can solve the problem of low accuracy of fitting or generalization ability prediction model
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0088] According to an embodiment of the present invention, an integrated power consumption growth prediction device that integrates high-frequency influencing factors is provided, Figure 4 It is a schematic diagram of an integrated power consumption growth forecasting device that integrates high-frequency influencing factors in Embodiment 1 of the device of the present invention, as shown in Figure 4 As shown, according to the embodiment of the present invention, the integrated power consumption growth prediction device that integrates high-frequency influencing factors specifically includes:
[0089] Factor selection module 40: used to select factors that may affect the growth of electricity consumption as alternative influencing factors, construct an XGBoost model based on the alternative influencing factors, measure the importance of each alternative influencing factor on the increase in electricity consumption, and determine the construction Factors influencing the use ...
Embodiment 2
[0096] An embodiment of the present invention provides an integrated power consumption growth forecasting device that integrates high-frequency influencing factors, such as Figure 5 As shown, it includes: a memory 50, a processor 52, and a computer program stored on the memory 50 and operable on the processor 25. When the computer program is executed by the processor 52, the following method steps are implemented:
[0097] S1. Select factors that may affect the growth of electricity consumption as alternative influencing factors, construct an XGBoost model based on the alternative influencing factors, measure the importance of each alternative influencing factor on the increase in electricity consumption, and determine the impact of building a forecast model factor.
[0098] Specifically, the method described in step S1 further includes:
[0099] S101. Combining with the actual needs of the power supply company for power dispatching, determine the alternative influencing fac...
Embodiment 3
[0132] An embodiment of the present invention provides a computer-readable storage medium, where a program for realizing information transmission is stored on the computer-readable storage medium, and when the program is executed by the processor 52, the following method steps are implemented:
[0133] S1. Select factors that may affect the growth of electricity consumption as alternative influencing factors, construct an XGBoost model based on the alternative influencing factors, measure the importance of each alternative influencing factor on the increase in electricity consumption, and determine the impact of building a forecast model factor.
[0134] Specifically, the method described in step S1 further includes:
[0135] S101. Combining with the actual needs of the power supply company for power dispatching, determine the alternative influencing factors from the perspectives of conventional factors and macro factors;
[0136] Among them, the conventional factors include:...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com