A kind of filling method of high-fill earth-rock embankment
A high filling and filling technology, applied in the direction of roads, buildings, roads, etc., can solve the problems of slow construction speed and poor economic benefits, achieve high practicability, improve construction speed, and ensure compaction quality and stability. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] A highway project in Shiyan City, Hubei Province is located in a mountainous area with alternate valleys, undulating terrain and large undulating terrain. The main line adopts a design speed of 80km / h and a general roadbed width of 55m. There are 9 high-fill embankments in this project, with a maximum filling height of 80m. The filling mainly uses dolomite, schist, etc. and their weathered materials from the roadbed excavation as embankment fillers. The embankment compaction degree is required to be no less than 93%. tight. The soil-rock mixture is used as the filler in the field sampling, which is referred to as earth-rock filler for short. Among the earth-rock fillers, the particle size of hard and medium-hard fillers is 30cm-40cm. The moisture content of the soil and rock filler is controlled within ±2% of the optimum moisture content. When the moisture content of the soil and rock filler exceeds the range of +2%, spread the filler with a bulldozer and dry it; when ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap