Risk assessment method and device for tunnel construction and storage medium
A technology for risk assessment and tunnel construction, applied in the direction of instruments, probabilistic networks, calculation models, etc., can solve the problems of insufficient training, engineering case data, and the inability to accurately construct BN network structure parameters, etc., to reduce the amount of model calculation and reduce demand volume effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] An embodiment of the present invention provides a risk assessment method for tunnel construction, such as figure 1 As shown, the risk assessment method includes:
[0052] S101, constructing a Bayesian network according to predetermined evaluation indicators, the evaluation indicators (referred to as indicators) include risk events of tunnel construction and impact indicators that cause the risk events;
[0053] S102, acquiring the construction site data of the current tunnel;
[0054] S103. Determine the structural parameters of the Bayesian network according to the construction site data, the Copula function of the interdependence of the evaluation indicators, and the marginal distribution parameters of each evaluation indicator;
[0055] S104, constructing the risk event prediction model according to the structural parameters and the Bayesian network;
[0056] S105. According to the preset correspondence relationship between the evaluation index value and the risk l...
Embodiment 2
[0175] An embodiment of the present invention provides a risk assessment device for tunnel construction. The risk assessment device includes a memory, a processor, and a computer program stored in the memory and operable on the processor;
[0176] The processor executes the computer program to implement the steps of the tunnel construction risk assessment method described in any one of the first embodiment.
Embodiment 3
[0178] An embodiment of the present invention provides a computer-readable storage medium, the computer-readable storage medium stores a risk assessment program for tunnel construction, and when the risk assessment program for tunnel construction is executed by a processor, it can implement the method described in the first embodiment. The steps of any one of the risk assessment methods for tunnel construction.
[0179] Embodiment 2 and Embodiment 3 can refer to Embodiment 1 in the specific implementation process, and have corresponding technical effects.