Production process of hot-rolled metal composite pipe

A metal composite pipe and production process technology, applied in the field of composite seamless pipe, can solve the problems of insufficient bonding strength of the inner cladding composite pipe, affecting product use, and high cost

Inactive Publication Date: 2021-06-25
LIAOCHENG ANTAI PETROLEUM MACHINERY
View PDF9 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

For example, it is more reasonable to use stainless steel pipes to manufacture pressure vessels and pipes that require corrosion resistance, but the cost is high; The thickness of the stainless steel pipe is only 2 to 10% of the overall thickness, which not only meets the corrosion resistance and high enough strength of the container, but also greatly reduces the cost
In addition, some metal materials with excellent heat resistance, corrosion resistance, electrical conductivity and thermal conductivity, such as copper, manganese, titanium or chromium, have the problem of scarcity of resources. If double-layer or multi-layer composite pipes are used, it will not only help save Resources, can also meet the special needs of many projects
[0003] Due to technical defects in the production process of the existing metal composite pipe, the problem of insufficient bonding strength of the inner cladding pipe of the bimetallic composite seamless pipe product occurs, which greatly affects the use of the product

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0029] A production process for a hot-rolled metal composite pipe, comprising the following steps:

[0030] A. Select the composite tube blank, the diameter of the composite tube blank is 210±1.6mm, the diameter tolerance of the ellipticity is 1.5mm, the inclination of the end face is not more than 5mm, the curvature is not more than 6mm per meter, and the double metal is tightly combined without delamination;

[0031] B. Inspect the selected composite tube blank, and punch the positioning hole on the composite tube blank. The positioning hole is located at the front end of the tube blank, with a diameter of 50mm, which improves the accuracy of the product wall thickness and reduces the length of the cutting head;

[0032] C. Heating the annular furnace, the heating rate is 10min / cm, and the heating temperature cannot exceed the specified maximum temperature by 10°C; Adjust to the temperature required by rolling; every time a piece of material is discharged, the bottom of the ...

Embodiment 2

[0042] A production process for a hot-rolled metal composite pipe, comprising the following steps:

[0043] A. Select the composite tube blank, the diameter of the composite tube blank is 210±1.6mm, the diameter tolerance of the ellipticity is 1.5mm, the inclination of the end face is not more than 5mm, the curvature is not more than 6mm per meter, and the double metal is tightly combined without delamination;

[0044] B. Inspect the selected composite tube blank, and punch the positioning hole on the composite tube blank. The positioning hole is located at the front end of the tube blank, with a diameter of 50mm, which improves the accuracy of the product wall thickness and reduces the length of the cutting head;

[0045] C. Heating the annular furnace, the heating rate is 10min / cm, and the heating temperature cannot exceed the specified maximum temperature by 10°C; Adjust to the temperature required by rolling; every time a piece of material is discharged, the bottom of the ...

Embodiment 3

[0055] A production process for a hot-rolled metal composite pipe, comprising the following steps:

[0056] A. Select the composite tube blank, the diameter of the composite tube blank is 210±1.6mm, the diameter tolerance of the ellipticity is 1.5mm, the inclination of the end face is not more than 5mm, the curvature is not more than 6mm per meter, and the double metal is tightly combined without delamination;

[0057] B. Inspect the selected composite tube blank, and punch the positioning hole on the composite tube blank. The positioning hole is located at the front end of the tube blank, with a diameter of 50mm, which improves the accuracy of the product wall thickness and reduces the length of the cutting head;

[0058] C. Heating the annular furnace, the heating rate is 10min / cm, and the heating temperature cannot exceed the specified maximum temperature by 10°C; Adjust to the temperature required by rolling; every time a piece of material is discharged, the bottom of the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
diameteraaaaaaaaaa
Login to view more

Abstract

The invention relates to the technical field of composite seamless pipe production, and discloses a production process of a hot-rolled metal composite pipe. The production process comprises the following steps that A, a composite pipe blank is selected; B, the selected composite pipe blank is inspected, and positioning holes are punched in the composite pipe blank; C, an annular furnace is heated; D, the cut-off pipe blank is perforated; E, pipe rolling is conducted; F, sizing is performed; G, cooling is conducted; H, correcting is performed; I, saw cutting is carried out; J, nondestructive inspection is conducted; and K, manual inspection, packaging and warehousing are carried out. The diameter of the composite pipe blank in the A is 210 + / -1.6 mm, the ovality diameter tolerance is 1.5 mm, the end face gradient is not greater than 5 mm, and the curvature is not greater than 6 mm per meter. According to the production process, the problem of insufficient bonding force strength of the inner-coated composite pipe of a bimetal composite seamless pipe product is solved, and a seamless pipe hot rolling process is adopted. The production process is suitable for production of the composite seamless pipe with a steel pipe as the outer layer and a stainless steel pipe as the lining, and bimetal composite seamless pipe products of various specifications are produced mainly aiming at research and development of a hot rolling process.

Description

technical field [0001] The invention relates to the technical field of composite seamless pipes, in particular to a production process of hot-rolled metal composite pipes. Background technique [0002] The application of metal composite pipes is mainly based on the purpose of economy and resource conservation, as well as special uses on various equipment. For example, it is more reasonable to use stainless steel pipes to manufacture pressure vessels and pipes that require corrosion resistance, but the cost is high; The thickness of the stainless steel pipe is only 2-10% of the overall thickness, which not only meets the corrosion resistance and high enough strength of the container, but also greatly reduces the cost. In addition, some metal materials with excellent heat resistance, corrosion resistance, electrical conductivity and thermal conductivity, such as copper, manganese, titanium or chromium, have the problem of scarcity of resources. If double-layer or multi-layer ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): B21C37/06
CPCB21C37/06
Inventor 高海瑞高万峰李凤魁李万明王胜永王军邓保行
Owner LIAOCHENG ANTAI PETROLEUM MACHINERY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products