Control system and method for plugging and unpinning of bridge body of bridge erecting vehicle and bridge erecting vehicle
A control system and bridge body technology, which is applied in construction and other directions, can solve the problems of large position error, increase the operating difficulty and safety risks of operators, and increase the time for bridge body withdrawal operation, so as to achieve the effect of improving efficiency and safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0056] figure 1 It is a block diagram of the pin-out control system of the bridge body provided by the first embodiment of the present invention. Such as figure 1 As shown, the control system includes:
[0057] The bridge erecting vehicle comprises a bridge body 1, an overturning mechanism 2, a steel wire rope 7 and a door frame 5, and the two ends of the steel wire rope 7 are respectively connected with the bridge body 1 and the door frame 5, and the movable pin 4 on the overturning mechanism 2 is connected to the bridge body on the bridge body. The straight chute slides 3 moving connections, and the bridge body 1 completes the erection and withdrawal actions through the turning mechanism 2, the movable pin 4, the door frame 5 and the steel wire rope 7. Landing and providing a fulcrum during withdrawal, the control system includes:
[0058] The first detection device is used to generate a first signal when the overturning mechanism reaches a designated position, and transm...
Embodiment 2
[0080] image 3 It is a block diagram of a control system for inserting and removing pins of a bridge body provided by the second embodiment of the present invention. Such as image 3 As shown, the control system includes:
[0081] The bridge erecting vehicle comprises a bridge body 1, an overturning mechanism 2, a steel wire rope 7 and a door frame 5, and the two ends of the steel wire rope 7 are respectively connected with the bridge body 1 and the door frame 5, and the movable pin 4 on the overturning mechanism 2 is connected to the bridge body on the bridge body. The straight chute slides 3 moving connections, and the bridge body 1 completes the erection and withdrawal actions through the turning mechanism 2, the movable pin 4, the door frame 5 and the steel wire rope 7. Landing and providing a fulcrum during withdrawal, the control system includes:
[0082] The first detection device is used to generate a first signal when the overturning mechanism reaches a designated...