Unlock instant, AI-driven research and patent intelligence for your innovation.

Engineering supervision method and system based on BIM

A technology for engineering and construction schemes, applied in the field of BIM-based engineering supervision methods and systems, can solve problems such as difficult and efficient coordination and affect the effective progress of construction, and achieve the effect of accurate and timely construction progress

Inactive Publication Date: 2021-11-23
河南育兴建设工程管理(集团)有限公司
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, the current construction project involves multiple departments from scheme design to construction to supervision, so it is difficult to coordinate efficiently, and it is impossible to provide timely solutions to problems that arise during the construction process, which affects the effective construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering supervision method and system based on BIM
  • Engineering supervision method and system based on BIM
  • Engineering supervision method and system based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0059] The embodiment of the present application discloses a BIM-based engineering supervision method.

[0060] refer to figure 1 , figure 2 , the BIM-based project supervision method includes:

[0061] Step S1: Supervision module 1 establishes construction inspection standards to evaluate construction quality, specifically: establish evaluation standards based on the amount of construction to be completed and the quality of construction to be achieved at the end of each construction stage.

[0062] In the whole construction process, according to the actual construction needs and the length of the total construction period, the construction process is divided into multiple construction stages. For each construction stage, the construction period and the construction quality required at the end of the construction stage are set. For example, for a building construction project, the building construction needs to build a 10-story building, which is divided into 10 constructio...

Embodiment 2

[0110] refer to figure 1 , a BIM-based project supervision system in this embodiment includes a supervision module 1 , a cost management module 2 , a progress management module 4 and a scheme management module 3 connected by communication.

[0111] The supervision module is used to establish construction inspection standards to evaluate construction quality, inspect the construction process and collect statistics on inspection results, and send detected problems to the scheme management module and cost management module. The scheme management module is used to modify the construction scheme according to the construction quality and construction cost. The cost management module is used to calculate the construction cost according to the construction plan. The progress management module is used for supervising the construction progress according to time nodes.

[0112] By implementing the BIM-based engineering supervision method, the BIM-based engineering supervision system ca...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a BIM-based engineering supervision method. The method comprises the steps of establishing a construction detection standard to evaluate construction quality; detecting the construction process, and counting the detection results; sending the detected problem to a scheme management module and a cost management module; modifying the construction scheme according to the construction quality and the construction cost; and sending the modified construction scheme to a progress management module, and supervising the construction progress according to time nodes by a progress management module. The BIM-based engineering supervision system executes the BIM-based engineering supervision method, and can timely provide a solution for problems occurring in the construction process.

Description

technical field [0001] This application relates to the field of engineering supervision, and in particular to a BIM-based engineering supervision method and system. Background technique [0002] In building construction, the construction process needs to be supervised. In the process of building construction, various problems will occur that affect the construction quality and construction progress, resulting in the inability of the construction process to proceed smoothly. It is necessary to monitor the construction process, find problems in the construction process in time, find out the cause of the problem, and find a solution to the problem, so as to adjust the construction plan to ensure the smooth progress of the construction process. [0003] However, the current construction project involves multiple departments from scheme design to construction to supervision, so it is difficult to coordinate efficiently, and it is impossible to provide timely solutions to problem...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/06395G06Q10/06312G06Q50/08
Inventor 余杰王章兵罗昌皇时久峰王瑞波郝立杰周展王晓宇李文海
Owner 河南育兴建设工程管理(集团)有限公司