Construction method of concrete diaphragm wall in mucky soil body with high water content
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- 乐昌市恒源水电建筑工程有限公司
- Publication Date
- 2022-04-05
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The application relates to the technical field of concrete, more specifically, it relates to a method for constructing a concrete anti-seepage wall in muddy soil with high water content. Background technique
[0002] The concrete cut-off wall is an underground continuous wall that is built by pouring concrete or backfilling other anti-seepage materials under the mud with mud-solid walls in loose permeable foundations or earth-rock dam dams.
[0003] However, in the existing construction method of pouring plastic concrete cut-off walls in silty soil with high moisture content, due to the long solidification time of the concrete, the concrete has not yet solidified after the concrete is poured, making the concrete cut-off walls easy to sink , so that the bearing capacity of the concrete cut-off wall is affected. Therefore, there is still room for improvement. Contents of the invention
[0004] In order to make the bearing capacity of the concrete cut...