Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

88results about How to "Improve connection integrity" patented technology

Fabricated building unit and assembly method thereof

The invention discloses a fabricated building unit and an assembly method thereof. The fabricated building unit comprises a first wallboard, a second wallboard and a connection piece used for the first wallboard and the second wallboard. One end face of the first wallboard is provided with a first dovetail groove extending vertically, and the end face, in butt joint with the first wallboard, of the second wallboard is provided with a second dovetail groove corresponding to the first dovetail groove. The connection piece comprises a connection pipe, a threaded rod, a limiting block which is rotationally connected to the end portion of the threaded rod and can rotate under the effect of gravity to a state inn which the limiting block is perpendicular to the threaded rod, and a gear which isfixedly arranged on the threaded rod in a sleeving manner. The connection pipe is preburied in the first wallboard, the connection pipe inwards extends from the groove bottom of the first dovetail groove, the connection pipe is internally provided with an internal thread, and the end portion of the threaded rod is provided with a movable groove for the limiting block to rotate to a state in whichthe limiting block is parallel to the threaded rod. The groove bottom of the second dovetail groove is inwards provided with an insertion hole, the size of the insertion hole can enable the limiting block and the threaded rod to insert in a parallel state, the second wallboard is provided with a movable cavity which communicates with the insertion hole, and the movable cavity can enable the limiting block to rotate to be perpendicular to the threaded rod.
Owner:惠州市鸿泰建筑工程有限公司

Surface mounting inductor manufacture method

The invention discloses a surface mounting inductor manufacture method comprising the following steps: firstly preparing an inductor body; carrying out insulation treatment for the surface of the inductor body besides an electrode portion; pre-processing the electrode portion of the inductor body; removing an insulation layer on end portions of two lead wires of a coil in the inductor body; depositing one or more layers of metal conductive layers on the surface of the electrode portion of the inductor body through either a physics vapour deposition technology, or chemical vapor deposition or electroplate and chemical plating technology, the metal conductive layers are the electrode, thus obtaining the surface mounting inductor; the advantages are that the electrode position mode is employed to form the electrode, the electrode can directly grow into form on the electrode portion of the inductor body, and the electrode can be directly deposited on the end portion of the lead wires of the coil in a forming process; the electrode and the lead wires are connected through atom combination so as to provide high connecting integration, thus greatly reducing DC resistance between the lead wires of the coil and the electrode; the DC resistance between the lead wires of the coil and the electrode is relatively small, so the performance of the surface mounting inductor is high.
Owner:NINGBO YUNSHENG ELECTRONIC COMPONENTS TECHNOLOGY CO LTD +1

Wood structure anti-shearing connecting element, connecting structure, box body platform structure and construction method

The invention relates to a wood structure anti-shearing connecting element, a connecting structure, a box body platform structure and a construction method. The connecting element is of an integral structure formed by sequentially and vertically bending a metal plate, and comprises a U-shaped web plate, flanges and hook heads, wherein the flanges symmetrically extend out from the two side surfaces of the web plate; the hook heads are formed by bending from the upper end parts of the flanges in a direction of being opposite to the web plate; and connecting holes are formed in each of the web plate, the flanges and the hook heads. The box body platform structure can be used as a lower part support structure for transforming the ground of a stadium into an ice surface; on the premise of not damaging the original field, the temporary transformation in the functional aspect can be fast completed by using the box body structure; and a technical feasible scheme is provided for transforming the existing ordinary stadium into a winter event stadium. By using the connecting element, the stability of the box body structure is ensured; and the reliability of the structure as a whole lower part supporter is ensured; the construction is simple and fast; the time and the labor are saved; and the construction efficiency and the construction quality can be effectively improved.
Owner:BEIJING NAT AQUATICS CENT CO LTD +3

Novel assembly type connecting joint

The invention discloses a novel assembly type connecting joint. The novel assembly type connecting joint comprises a prefabricated bracket column and prefabricated beams, and further comprises screw rods, first through holes, grooves, tie rods and second through holes, wherein the screw rods are fixed to brackets and parallel to the prefabricated bracket column, the ends of the prefabricated beamsare placed on the brackets and connected with the brackets in a bolt fit mode, the first through holes are formed in the end parts, corresponding to the screw rods, of the prefabricated beams in a penetrating mode, the grooves are formed in the surfaces of the end parts of the prefabricated beams and comprise first grooves formed in the upper ends of the first through holes, the diameters of thefirst grooves are larger than the diameters of the first through holes, the grooves further comprise second grooves perpendicular to the width direction of the prefabricated beams, one ends of the second grooves communicate with the first grooves, the other ends of the second grooves extend to the edges of the end parts, circular rings are arranged at the two ends of rod bodies of the tie rods, the sizes of the rod bodies are matched with the sizes of the second grooves, the outer diameters of the circular rings are matched with the size of the first grooves, the inner diameters of the circular rings are the same as the diameters of the first through holes, and the second through holes are formed in the mode of being parallel to the width direction of the prefabricated bracket column in apenetrating manner.
Owner:HUAIYIN INSTITUTE OF TECHNOLOGY

Construction method facilitating guarantee of hollow floor structural size

The invention relates to a construction method facilitating guarantee of hollow floor structural size. The construction method comprises the following steps that S1, a horizontal bottom formwork is laid; S2, a plurality of bottom layer steel bar cushion blocks are arranged on the bottom formwork, and a bottom steel bar layer is laid; S3, a plurality of second connecting pieces are used for connecting the bottom steel bar layer with the bottom formwork; S4, a plurality of placeholder box body cushion blocks are arranged on the bottom formwork, and a placeholder box body layer is laid; S5, an anti-floating steel bar layer is laid on the placeholder box body layer, and the anti-floating steel bar layer is supported by the placeholder box body layer; S6, a plurality of first connecting piecesare used for connecting anti-floating layer and the bottom formwork; S7, a plurality of top layer steel rib cushion blocks are arranged on the placeholder box body layer, and a top steel bar layer islaid; and S8, a plurality of third connecting pieces are used for connecting the top steel bar layer and the bottom steel bar layer. The anti-floating steel bar layer and the first connecting pieces are used for preventing placeholder box body tilting float after concrete slurry pouring, components in the floor are effectively fixed to guarantee the structure size of the floor to meet design sizerequirements and improve floor quality.
Owner:CHINA METALLURGICAL CONSTR ENG GRP

Prefabricated concrete dry-type connection method and prefabricated concrete wall

The invention provides a prefabricated concrete dry-type connecting method and a prefabricated concrete wall. The prefabricated concrete dry-type connecting method comprises the steps that a plurality of to-be-assembled concrete wallboards with mounting grooves are placed at preset positions; connecting plates are embedded into the mounting grooves formed in the multiple concrete wallboards, so that the multiple concrete wallboards are connected with one another; and a connecting material is added into mounting gaps formed between the connecting plates and the corresponding mounting grooves. Through the mode, a plurality of concrete wallboards are connected through the connecting plates, the connecting materials are added into the mounting gaps formed after connection so as to further reinforce the connecting integrity of the concrete wallboards; and the connecting plates are matched with the mounting grooves, so that the structure is simple, disassembly and assembly are convenient, high precision is not needed, the defect that in the prior art, a dry-type connecting method is high in manufacturing and installation precision requirement is overcome, and therefore popularization and implementation are convenient.
Owner:BEIJING UNIVERSITY OF CIVIL ENGINEERING AND ARCHITECTURE

Structure of pressure-resistant oil tank and manufacturing method thereof

ActiveCN110549584AFirmly connectedStable seamingBlow moldingFuel tank
The invention relates to a structure of a pressure-resistant oil tank and a manufacturing method thereof. According to the main points of the technical scheme, the manufacturing method of the pressure-resistant oil tank comprises the following steps that S1, a connection part is installed, an installation rod is inserted into a sleeve from one end of a matching disc during installation, and a gapis reserved between an installation disc and the matching disc; S2, the connection part is fed into a blow molding mold through a feed part, a blow molding machine blows out a molten parison, the parison is put into the mold, and the blow molding mold is closed; S3, the installation disc makes contact with the parison and presses the parison into a shaft hole, a pressing driving part pushes a shaft sleeve to move along the shaft hole and rotates at the same time, and the shaft sleeve pushes the installation disc to abut against the matching disc; and S4, the blow molding mold is opened, the feed part is taken out from the blow molding mold, then the blow molding mold is closed again, the mold is opened again after the parison is cooled, and the effect that connection strength and stabilitybetween an anti-wave plate and the inner wall of the pressure-resistant oil tank are improved is achieved.
Owner:德安福(天津)汽车技术有限公司

Construction method of navigation mark system

The invention relates to a construction method of a navigation mark system. The construction method of the navigation mark system comprises the steps of: 1) determining the position of a navigation mark; 2) arranging a ship-type buoy; 3) arranging a side surface pole beacon; 4) arranging a lifting type shore beacon; and 5) arranging a bridge opening mark. The construction method of the navigationmark system has the beneficial effects that the connecting strength of the ship-type buoy and a foundation soil layer is high, the stability of a mark boat is good, and the field positioning is convenient; the pole beacon positioning accuracy of the side surface pole beacon is high, the field mounting of an assembled foundation is convenient, and the connecting integrity of the assembled foundation and the foundation soil layer is good; the lifting type shore beacon adopts different connecting modes according to the soil property situations of the foundation soil layer, the field constructionof the structure is convenient, and the application range is wide; the connection between the bridge opening mark and a pier stud is convenient, the connecting strength of the bridge opening mark andthe pier stud is high, the connecting and positioning of the structure are accurate, and the wind-resistant performance is good.
Owner:HANGZHOU JIANGRUN TECH LIMITED

An ornamental flower box structure for horticultural plant cultivation

InactiveCN110149954BEasy to adjustEasy to discharge stagnant waterReceptacle cultivationCotton padEngineering
The invention provides an ornamental flower box structure for horticultural plant cultivation, which includes a lifting block; the rectangular opening has two places, which are rectangular groove structures, and is set at the bottom of the front and rear sides of the flower box; the bevel angle is 40 Five degrees are the chamfered edges of the bottom edges of the left and right sides of the flower box; the half-back groove is half-back, and there are two places in total, which are set at the left and right ends of the top side of the flower box; the round head hole is a long hole, The upper and lower ends are semicircular, and there are two places in total, and the front and rear directions are set at the bottom of the flower box; the biochemical cotton pad is placed inside the flower box; the soil layer is covered on the side of the biochemical cotton top; the present invention can be installed at the bottom. Adjust the height of the roller, you can move the flower box freely, and then retract the roller after fixing the position, increase the contact area with the ground, good stability, can connect adjacent flower boxes, and at the same time, when the rain is heavy in rainy days, Drain water to the ground through the overflow hole without splashing water and reduce soil loss at the same time.
Owner:磐安县双申工艺品有限公司

Underground diaphragm wall I-shaped steel joint water stop control structure and construction method thereof

PendingCN111206566AGuarantee the quality of water stopInhibition formationArtificial islandsUnderwater structuresSlurry wallWater stop
The invention discloses an underground diaphragm wall I-shaped steel joint water stop control structure and a construction method thereof, and relates to the field of building construction. The underground diaphragm wall I-shaped steel joint water stop control structure comprises an underground diaphragm wall groove section, an I-shaped steel joint, a steel reinforcement cage, concrete, a port locking pipe and back pressing broken stones; the cross section of the I-shaped steel joint faces upwards, and the I-shaped steel joint is vertically arranged in the underground diaphragm wall groove section; the steel reinforcement cage is welded to one side face of a web of the I-shaped steel joint; the concrete is poured to the steel reinforcement cage and poured into the underground diaphragm wall groove section; the cross section of the port locking pipe faces upwards, and the port locking pipe is vertically and closely attached to the other side face of the web of the I-shaped steel joint;the other side of the port locking pipe is filled with the back pressing broken stones; and a pair of slurry stop plates are symmetrically welded to the outer side of a flange plate of the I-shaped steel joint, and slurry stop pressing strips are welded to the outer sides of the inner ends of the slurry stop plates. According to the underground diaphragm wall I-shaped steel joint water stop control structure and the construction method thereof, the problems that in an existing underground diaphragm wall I-shaped steel joint construction water stop method, round flowing of the concrete is difficult to control, the water stop quality is difficult to control, a large amount of manpower and construction period are consumed, and the construction efficiency is low are solved.
Owner:CHINA CONSTR FIRST GROUP THE FIFTH CONSTR +1

Construction method for slope ecological protection

The invention relates to a construction method for slope ecological protection. The construction method comprises the steps that 1, sundries in an adjacent drainage side ditch are removed, and materials and devices needed by construction are prepared; 2, 1-2 rows of stone-picking tenons are arranged on the free face of the slope face of a slope; 3, a weight filling body, a damping buffer layer and an anti-collision pile body are sequentially arranged on the upper surface of a supporting and blocking bottom plate; 4, a slope soil body is excavated, and a lattice beam arranging groove is excavated in the slope soil body; and 5, a lattice beam cap plate is arranged on the upper surface of a slope face lattice beam, and the lattice beam cap plate and the slope face lattice beam are firmly connected through cap plate fastening bolts. The construction method has the beneficial effects that the impact force in the falling process of rolling stones is further reduced; the stability of the supporting and blocking bottom plate and a supporting and blocking outer column and the connection integrity of a vegetation mesh bag and the slope soil body are effectively improved; the connection strength between the slope face lattice beams can be improved; and the difficulty of moving of a turf position control body and positioning of greening turf and the difficulty of filling of a mesh bag filling body are effectively reduced.
Owner:湖北省路桥集团有限公司

Lightweight concrete block for environment-friendly construction and preparation method thereof

The invention discloses a lightweight concrete block for environment-friendly construction and a preparation method of the lightweight concrete block. The invention belongs to the technical field of buildings. According to the invention, an innovative mode of throwing the spontaneous gas inner vibrating ball can be realized, based on the magnetic repulsion effect, the magnetic particles are autonomously and uniformly distributed in the slurry, then, the gas generation action is triggered under the heating action, the built-in gas-forming powder begins to be heated and decomposed to release gas, the natural gas is released into the slurry along a gas-forming outer hopper on the natural gas-forming inner vibrating ball, fine and uniform air holes are formed, the concrete building block has aporous structure, the traditional gas generating material is replaced, meanwhile, when the spontaneous gas inner vibrating ball releases gas, high frequency vibration is formed in the slurry so thatthe fluidity and uniformity of the slurry are improved, thus indirectly improving the strength of the block. According to the self-aerated concrete block, the self-aerated inner vibration ball is arranged in the slurry, high-frequency vibration is formed in the slurry, the fluidity and uniformity of the slurry are improved, the strength of the block is indirectly improved, the self-aerated inner vibration ball and the block can form a tight whole, the strength of the block is further improved, a large pore channel is reinforced, and a block forming process is greatly improved.
Owner:成都鑫筑博建材有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products