Resource scheduling method and system of core network

A resource scheduling and core network technology, applied in the field of mobile networks, can solve problems such as no solution proposed, affecting the normal use of users, and other network elements being unable to adjust, so as to improve service reliability, state and resource unification, and automatic adjustment. Effect

Pending Publication Date: 2022-05-13
ALIBABA (CHINA) CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the 5G (5th Generation Mobile Networks, fifth-generation mobile communication technology) core network network, it is necessary to cooperate with multiple network elements to provide complete 5G core network services. There is only signaling interaction between network elements, and when the service status of some network elements is abnormal, other network elements cannot be adjusted, which affects the normal use of users.
[0003] For the above problems, no effective solution has been proposed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Resource scheduling method and system of core network
  • Resource scheduling method and system of core network
  • Resource scheduling method and system of core network

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0025] According to an embodiment of the present application, a method for resource scheduling of a core network is also provided. It should be noted that the steps shown in the flow chart of the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions, and, Although a logical order is shown in the flowcharts, in some cases the steps shown or described may be performed in an order different from that shown or described herein.

[0026] The method embodiments provided in the embodiments of the present application may be executed in mobile terminals, computer terminals or similar computing devices. figure 1 It shows a block diagram of the hardware structure of a computer terminal for realizing the resource scheduling method of the core network. Such as figure 1 As shown, the computer terminal 10 may include one or more (102a, 102b, ..., 102n are used to show in the figure) processors (processors may include but not limited to ...

Embodiment 2

[0076] According to an embodiment of the present application, a core network resource scheduling device for implementing the above core network resource scheduling method is also provided, such as Figure 4 As shown, the device 400 includes: a detection module 402 and an adjustment module 404 .

[0077] Among them, the detection module 402 is used to detect the working status of multiple network elements included in the core network, wherein the multiple network elements are deployed in the container cluster, and different network elements are used to provide different functions of the core network; the adjustment module 404 is used to The adjustment strategy corresponding to the working state adjusts multiple network elements.

[0078] It should be noted here that the detection module 402 and the adjustment module 404 correspond to steps S202 to S204 in Embodiment 1, and the examples and application scenarios realized by the two modules are the same as those of the correspond...

Embodiment 3

[0097] According to an embodiment of the present application, a core network resource scheduling system for implementing the above core network resource scheduling method is also provided, such as Figure 5 As shown, the system 500 includes:

[0098] The interface server 52 is configured to store adjustment policies.

[0099] The above-mentioned interface server may be an interface server of K8S, but is not limited thereto.

[0100] The controller 54 is connected to the interface server, and is used to detect the working status of multiple network elements included in the core network, and adjust the multiple network elements based on the adjustment policy corresponding to the working status, wherein the multiple network elements are deployed in the container In the cluster, different network elements are used to provide different functions of the core network.

[0101]The above-mentioned controller may be a 5G controller extended and implemented based on a Kubernetes CRD (C...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a resource scheduling method and system of a core network. The method comprises the steps that the working states of a plurality of network elements contained in a core network are detected, the network elements are deployed in a container cluster, and different network elements are used for providing different functions of the core network; and adjusting the plurality of network elements based on an adjustment strategy corresponding to the working state. The technical problem that normal use of a user is affected due to the fact that the network element service state contained in a 5G core network is abnormal in the related technology is solved.

Description

technical field [0001] The present application relates to the field of mobile networks, in particular, to a resource scheduling method and system for a core network. Background technique [0002] In the 5G (5th Generation Mobile Networks, fifth-generation mobile communication technology) core network network, it is necessary to cooperate with multiple network elements to provide complete 5G core network services. There is only signaling interaction between network elements, and when the service status of some network elements is abnormal, other network elements cannot be adjusted, which affects the normal use of users. [0003] For the above problems, no effective solution has been proposed yet. Contents of the invention [0004] The embodiment of the present application provides a core network resource scheduling method and system to at least solve the technical problem in the related art that the network element service status included in the 5G core network is abnormal...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H04W24/04H04W72/12
CPCH04W24/04H04W72/1263
Inventor 郝文杰
Owner ALIBABA (CHINA) CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products