Cost change management system and method, and readable storage medium
A management method and cost technology, applied in data processing applications, special data processing applications, instruments, etc., can solve problems that cannot truly reflect the cost of construction projects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0049] The present application will be further described in detail below with reference to the accompanying drawings.
[0050] The embodiments of the present application disclose a cost change management system, method, and readable storage medium.
[0051] refer to figure 1 , the cost change management method includes the following steps:
[0052] S110, the event of determining the cost change is determined to obtain the determination result.
[0053] Among them, if the construction project changes during the construction process, the project cost will change. When the cost change event occurs, the reason for the cost change needs to be identified. At this time, the original data and the changed data can be compared through the BIM model. The data is compared, so that the location of the construction cost problem can be located through the identification result.
[0054] S120 , change the fee based on the determination result.
[0055] Among them, if the identification re...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


