Deep foundation pit dismounting and replacing support construction method for building construction

A construction method and deep foundation pit technology, applied in construction, excavation, infrastructure engineering, etc., can solve problems affecting on-site construction, high material consumption, limited scope of application, etc., to speed up construction progress, ensure safety, and save machinery Effect

Pending Publication Date: 2022-07-01
SHANXI CONSTR ENG GROUP CORP
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In order to solve this technical problem, the application number 201910635034.0 discloses a deep foundation pit support assembly type support replacement construction tooling and construction method, the tooling includes support piles, uploading force belts, fertilizer grooves, downward force belts, outer walls The structure, foundation floor, pre-demolished internal support, upper pre-installed steel pipe assembly, assembled diagonal brace, lower pre-processed steel pipe assembly, and concrete pier are assembled into a single complete power transmission belt through the above components, but the construction period for this type of power transmission belt is set It is long and consumes a lot of materials. It cannot be used as a permanent support structure. It can only be applied to the bottom plate of the foundation pit. The scope of application is limited, which affects the on-site construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0012] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention will be further described in detail below with reference to the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, but not to limit the present invention.

[0013] A construction method for dismantling and replacing braces in a deep foundation pit for building construction is carried out according to the following steps:

[0014] Step S1, arranging reinforcement holes, arrange reinforcement holes at the intersections of the main structure wall, main structure column and inner support beam, and arrange the corresponding number of reinforcement holes according to the position and size of the main structure wall and main structure column on the inner support beam. , Reinforcement holes are drilled with rhinestones according to different steel ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a deep foundation pit dismounting and replacing support construction method for building construction, and belongs to the technical field of basement construction. According to the construction method, an inner support is not disassembled in the main body construction stage, main body wall and column steel bars are drilled to penetrate through an inner supporting beam, a support changing system formed by combining a support changing beam and a force transmission plate strip is additionally arranged, main body structure construction is conducted firstly, after the main body is constructed to +/-0.000m, the support is disassembled, and cutting is conducted through a rope saw for support disassembling; by means of the construction method, the safety of the foundation pit in the construction main body stage is powerfully guaranteed, the construction progress is accelerated, machines, manpower, materials and the like are saved, and the safety of the surrounding environment is guaranteed.

Description

technical field [0001] The invention relates to a construction method for dismantling and replacing braces for deep foundation pits for building construction, and belongs to the technical field of basement construction. Background technique [0002] With the rapid development of the economy and the acceleration of the urbanization process, the utilization of urban space gradually tends to the excavation of three-dimensional space, and deep foundation pits continue to emerge. In the construction of deep foundation pit, the process of dismantling and replacing braces has become a difficult problem in construction. In order to solve this technical problem, Application No. 201910635034.0 discloses a deep foundation pit inner-supported assembled support replacement construction tooling and construction method, the tooling includes a support pile, an upper force belt, a fertilizer trough, a lower force belt, an outer wall The structure, base plate, pre-removed inner support, uppe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/04E02D15/02E02D31/02
CPCE02D17/04E02D15/02E02D31/02
Inventor 巩伯斌韩学礼刘丽强潘辰荣罗海艳王玉龙刘伟郭伟岗王江鹏王蕾
Owner SHANXI CONSTR ENG GROUP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products