Regional new energy ultra-short-term power prediction method and system
A power prediction and new energy technology, applied in prediction, neural learning methods, instruments, etc., can solve the problems of increasing difficulty of prediction and decreasing accuracy of power prediction, and achieve the effect of improving prediction accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] like figure 1 As shown, a regional new energy ultra-short-term power prediction method includes the following steps:
[0038] Step 1. Determine the new energy station with the highest correlation with the actual power generation in the area to be predicted
[0039] Select the actual power generation data of each new energy station in the last two months at the current time point and the actual power generation data of the entire area, and construct the actual generation power sequence of each new energy station and the entire area to be tested at 15-minute intervals. The actual power generation sequence, each sequence is equivalent to a one-dimensional array. For example, the data of a certain station for 2 hours can form a one-dimensional array of 8 elements. The value of each element is the actual power generation within the 15 minutes. Power average. In addition, there are N+1-dimensional arrays in the area to be tested. In order to remove the influence of differen...
Embodiment 2
[0051] The present invention also provides a new energy ultra-short-term power prediction system, including:
[0052] The new energy station determination module is used to determine the new energy station with the highest correlation between the actual power generation and the actual power generation in the area to be predicted;
[0053] The prediction data acquisition module is used to obtain the historical power prediction data of the preliminary prediction of the most relevant new energy stations;
[0054] The forecast sequence building module is used to extract the power generation forecast data of the last forecast period in each forecast period from the preliminary forecast historical power generation forecast data, and use the data to construct a new energy power forecast sequence;
[0055] The prediction model building module is used to train the prediction model with the new energy power prediction sequence and the historical measured data of the area to be predicted...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com