Single-well water pumping and recharging system
A hydrothermal and water layer technology, applied in directional drilling, wellbore flushing, drilling equipment, etc., can solve the problems of unfavorable commercial development and increased cost of geothermal exploitation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0007] ① Determine the design plan according to the geological data and carry out drilling construction according to the design plan. After the vertical well is drilled, logging and completion operations are performed, that is, casing cementing is performed, and then perforation, water pumping and well flushing operations are performed.
[0008] ②According to the actual drilling geological data and data of the drilled vertical wells, determine the trajectory and construction plan of the windowed recharge wellbore, and carry out drilling construction according to the design plan. First, the plug is set at the lower part of the side-drilling point (about 50 meters) to prevent the water layer from being polluted by particles during drilling. Then run the ramp at the sidetrack point for window drilling. After drilling, the casing should be run, and the screen pipe should be run in the water layer well section. After the completion of the well, a large-displacement pumping and wa...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
