Method for deploying data transmission on forward link and its communication system
A forward link and communication system technology, applied in the field of forward link rate scheduling, can solve the problems of insufficient utilization of forward link capacity in cellular areas, waste of forward link capacity up to 3dB peak reserve, etc., to achieve improved utilization Rate, reduce the effect of transmission delay
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 2 example
[0170] For the second embodiment, the entire data frame is encoded with one set of CRC bits. Preferably, the number of CRC bits is less than the total number of CRC bits used in the first embodiment. In the above example, for 12 code channel frames, the number of CRC bits used is at least 12, but less than 144. Since there are about 12 times more data bits, more CRC bits are required in order to detect frame errors with higher reliability. Assuming that 24 CRC bits make it possible to detect frame errors with the required reliability, the 24 CRC bits can be divided into 12 CRC blocks, where each CRC block contains two CRC bits. A CRC block is appended to each of the 12 data sections. Alternatively, 24 CRC bits may be sent on one code channel frame. At the remote station 6, the data portion and the 24 CRC bits are reprogrammed. Remote station 6 can only determine whether all 12 code channel frames were received correctly. If frame errors are indicated, remote station 6 can...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 