first embodiment
[0048] In the first place, a first embodiment will be described. A system exemplified in this embodiment, which is one of information processing apparatus for project management, is intended for supporting the management and implementation of a project. The system comprises two functions: one displays on a screen a task area where a symbol representing a document relating to at least one task constituting a project and a symbol representing task are displayed; the other performs document work according to an operation instruction for the symbol representing the document displayed in the task area. The task area has a work area and an output area. The work area displays a symbol representing a document of a task and a symbol representing task other than output work. The output area displays a symbol representing a document in a task area of another associated task constituting the project when a symbol representing a document is moved within the output area.
[0049]FIG. 1 illustrates a...
second embodiment
[0092] A second embodiment will be described. This embodiment is an example of association among a plurality of users or tasks, which will be described below. FIG. 1 illustrates a functional configuration of a project management / implementation support system 2g according to this embodiment. This embodiment is based on the assumption that a plurality of users (in FIG. 11, there are two persons 4g, 4h) establish connections to a user interface management unit 23g via a network 30g. For example, a possible specific embodying means of the network 30g is a dedicated cable such as RS232C, a dedicated LAN, or the Internet. However, the means is not limited in particular here.
[0093] This configuration has the advantage that the plurality of users can share information about a project, a task, and a work package at their respective different locations simultaneously.
[0094] Moreover, providing the user interface management unit 23g with a user management function permits a work package deskt...
third embodiment
[0132] A third embodiment will be described. As shown in FIG. 18, this embodiment is a business model of a project management business model which uses a project management / implementation support system.
[0133] In FIG. 18, for example, a project management company 72j undertakes management business of a building construction project from an orderer 71j of the building construction. The project management company 72j creates a project plan in cooperation with, for example, a construction company 73j. In this process, the project management company 72j creates task data and work package data according to the present invention, and then stores the data in a project management system 721j and in a DB for the purpose of management. The task and the work package are defined on a company basis; in this case, at least the companies relate to the construction project, and include a construction company 73j, a facility company 74j, an equipment maker 75j, a gas company 76j, a telephone company...
PUM