Mine prop jack and method of prestressing a mine prop
a technology of mine props and jacks, which is applied in the direction of props/chocks, mining structures, earthwork drilling and mining, etc., can solve the problems of mortar setting time of several hours and roof pressure too high for conventional roof bolts, and achieve the effect of eliminating the requirement for water and cemen
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Benefits of technology
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0010]Referring to the drawings, the telescopically expandable mine prop 10 includes a lower pipe section 11 which telescopically or slidably receives therein upper pipe section 12. Head plate 13 and foot plate 14 are welded to opposite ends of the prop 10 and the prop 10 is thus expandable such that head plate 13 and foot plate 14 respectively engage the mine roof 15 and mine floor 16. A vertical series of apertures 17 are provided in the mine prop 10 in order to receive a lock pin therein to permit preliminary adjustable locking of the mine prop 10 prior to full expansion for prestressing and subsequent locking of the prop 10 after full expansion for prestressing.
[0011]Jack post 20 of the present invention includes upper and lower clamps 21 and 22 respectively which consist of spaced ears 23 that engage opposite sides of prop 10 and are retained in position temporarily by the placement of bolts 24 through aligned apertures provided in the spaced ears 23. This retains jack post 10 ...