This application discloses a self-elevating rock-embedded platform, comprising: a
hull platform with multiple
pile-planting positions; lifting legs mounted on the
hull platform and capable of lifting to drive the
hull platform to switch between a
relocation state and a construction state; a rock-embedded drilling rig mounted on the hull platform for rock-embedded construction at the
pile-planting positions; and hoisting equipment mounted on the hull platform. This application reduces the
relocation time from one or even two days to one or two hours, significantly increasing platform
relocation efficiency. Since the rock-embedded drilling rig does not need to be disassembled during platform relocation, the safety and reliability of the relocation are higher. During platform relocation, there is no need for a large floating crane vessel for relocation construction, which is the most expensive construction machinery in rock-embedded construction; this solution will significantly reduce the cost of rock-embedded construction. The floating hull platform, compared to the prior art which requires disassembling the crane, significantly improves safety and boundary conditions.