Double-end expansion meshing-body pile-connecting fastener and prefab
A prefabricated and integrated technology, which is applied in the direction of sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of slow docking pile speed, complicated manufacturing mold and process, high processing cost, etc., to achieve fast docking piles and work efficiency The effect of high cost and low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] Embodiment 1: with reference to attached Figure 1~5 . The double-ended expansion engaging body pile buckle is composed of two expansion nuts 1, the double-ended expansion engaging body 3 and the expansion pin 2. When docking, the expansion body of the double-end expansion engaging body 3 expands in the In the expansion chamber 6 in the two expansion nuts 1 and expand and engage with the meshing teeth on the wall of the expansion chamber, see the attached figure 1 . Tension nut 1 adopts metal (as steel, stainless steel, alloy steel etc.) or non-metallic material (as plastics, synthetic plastics, pottery etc.) to make by existing casting or injection molding or pottery firing or machining technology. The inner side of the cap opening of the expansion nut 1 is a strong wire buckle 7, and the center of the bottom of the cap is provided with a steel bar hole 4, and the periphery of the steel bar hole is a steel bar heading card platform 5, and the expansion engagement cav...
Embodiment 2
[0018] Embodiment 2: with reference to attached Image 6 . On the basis of Example 1, the prefabricated parts (pipe piles----round tubular, square pipe piles, etc.) composed of double-headed expansion meshing body buckles, the two ends of the prefabricated parts 10 are respectively equipped with expansion nuts 1 , the upsetting heads 11 at both ends of several longitudinal steel bars in the prefabricated part 10 are respectively clamped on the steel bar upsetting head clamping table 5 in the expansion nut 1, and the double-headed expansion engaging body 3 and the expansion pin 2 are used for two prefabricated parts 10 butts. (when the double-ended expansion body 3 is docked with the pipe pile, the expansion body in the double-ended expansion body expands in the tension nut 1; when the pipe pile and the pipe pile are not docked, the double-ended expansion body 3 and the Pull the nut 1 to separate and keep it separately).
Embodiment 3
[0019] Embodiment 3: with reference to attached Figure 7 . On the basis of Examples 1 and 2, the pile connection structure between the pipe pile and the pipe pile, or between the bridge pier and the bridge pier, or between the utility pole and the utility pole, which is composed of a double-ended expansion engaging body pile connection, the two to be docked The ends of the prefabricated parts are respectively provided with several expansion nut openings and the openings of the expansion nuts are opposite to each other. The double-ended expansion engagement bodies are respectively expanded in the expansion chambers of the expansion nuts through the expansion pins to complete the gap between the prefabricated parts and the prefabricated parts. docking.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com