Double-end expansion meshing body pile-connecting end plate and prefab
A technology of expansion and integration, which is applied in sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of complex manufacturing molds and processes, slow speed of docking piles, high processing costs, etc., and achieve high work efficiency and fast docking Pile, the effect of low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] Embodiment 1: with reference to attached Figure 1-5 . The double-headed expansion engaging body piling end plate includes an end plate 12, and two or more expansion nuts 1 are distributed (welded) on the end plate 12. When docking, the expansion body of the double-headed expansion engaging body 3 is in the Under the action of the expansion pin 2, it expands in the expansion cavity 6 in the expansion nut 1 and expands and engages with the meshing teeth on the wall of the expansion cavity. figure 1 . Tension nut 1 adopts metal (as steel, stainless steel, alloy steel etc.) or non-metallic material (as plastics, synthetic plastics, pottery etc.) to make by existing casting or injection molding or pottery firing or machining technology. The inner side of the cap opening of the expansion nut 1 is a strong wire buckle 7, and the center of the bottom of the cap is provided with a steel bar hole 4, and the periphery of the steel bar hole is a steel bar heading card platform 5...
Embodiment 2
[0018] Embodiment 2: with reference to attached Figure 6 . On the basis of Embodiment 1, the prefabricated parts (pipe piles----circular tubular, square pipe piles, etc.) composed of double-headed expansion meshing body pile end plates, the two ends of the prefabricated part 10 are respectively equipped with expansion and pulling The piling end plate 12 of the nut 1, the upsetting heads 11 of the two ends of several longitudinal steel bars in the prefabricated part 10 are respectively clamped on the steel bar upsetting head clamping platform 5 in the expansion nut 1, and the double-headed expansion engagement body 3 and Expansion pin 2 is used for the docking between two prefabricated parts 10 . (When the double-headed expansion body 3 is docked with the pipe pile, the expansion body in the double-headed expansion body expands in the expansion nut 1 and engages with it; when the pipe pile and the pipe pile are not docked, its double-headed expansion Body 3 is separated from...
Embodiment 3
[0019] Embodiment 3: with reference to attached Figure 7 . On the basis of Examples 1 and 2, the pile connection structure between the pipe pile and the pipe pile, or between the bridge pier and the bridge pier, or between the utility pole and the utility pole, which is composed of the pile connection end plate of the double-ended expansion meshing body, the two to be docked The ends of each prefabricated part are respectively equipped with a plurality of tension nuts with end plates, the mouth of the tension nut at the end of one prefabricated part is opposite to the mouth of the tension nut at the end of the other prefabricated part, double-headed expansion The engaging bodies are respectively expanded in the expansion cavity of the expansion nut through expansion pins and engaged with the teeth on the wall of the expansion cavity to complete the butt joint between prefabricated parts and prefabricated parts.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com