Integral molding method of pressure-change gas-exhaust type air vent
A technology of integral molding and exhaust channels, applied in the direction of prefabricated components, etc., can solve the problems of material cost, labor cost increase, easy falling off, etc., and achieve the effect of not easy falling off, saving material cost and labor cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Embodiment 1: Integral molding method of a pressure-changing air-drawing exhaust channel provided with a guide pipe and a Venturi plate
[0032] The specific steps of this embodiment are as follows, as Figure 1 to Figure 16 Shown:
[0033] 1. See figure 1 with figure 2 , use cement mortar material to make semi-finished guide pipe 1, and when semi-finished guide pipe 1 is hardened, the inner surface of semi-finished guide pipe 1 is smooth and flat, and welded mesh is placed on the outer surface as structural reinforcement material 2 of cement mortar, and reinforcement material 2 is laid out The area is greater than the peripheral surface of the semi-finished guide tube 1, and the air outlet end face 101 of the semi-finished guide tube 1 is equal to the thickness of the finished guide tube;
[0034] 2. On the flat and smooth concrete ground 5, two side molds 3 and two end frame molds 4 of the exhaust duct formwork are supported, such as image 3 with Figure 4 show...
Embodiment 2
[0041] Embodiment 2: Integral molding method of the pressure-changing air-drawing type exhaust channel whose pressure-changing component is a Venturi plate
[0042] The concrete steps of this embodiment are as follows:
[0043] 1. Two side molds and two end frame molds are supported on the flat and smooth concrete ground or bottom mold;
[0044] 2. Set the pipe wall of the intake surface of the exhaust duct as the side close to the ground, and wipe the cement mortar on the pipe wall of the intake surface of the exhaust duct to meet the thickness requirements of the pipe wall;
[0045] 3. Wipe the cement mortar on the pipe wall on both sides of the exhaust duct. After meeting the thickness requirements of the pipe wall, set up the Venturi plate bottom form. Place the prepared flat top form on the opening surface of the plate, smooth the cement mortar on the flat top form and make it integrated with the cement mortar on the pipe walls on both sides of the exhaust duct as a whol...