Stretch-drawing method for prestressed ribs of concrete bridge
A technology of prestressed tendons and concrete, which is applied in the direction of construction, building structure, and building material processing, etc., and can solve problems such as complex construction technology, large channel friction loss, and high quality requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0020] A kind of concrete bridge prestressed tendon stretching method of the present embodiment comprises the following steps successively:
[0021] A. Determine the initial stress and tension according to the design requirements, and install jacks at both ends of the prestressed tendons;
[0022] B. Jacks are loaded in stages to stretch the prestressed tendons;
[0023] C. After the load reaches the design tension, hold the load for 5 to 30 minutes, return oil, self-anchor, back off the top, and complete the first tension;
[0024] D. Park for 5-10 days;
[0025] E. Repeat steps B and C to complete the second tension.
[0026] Among them, the graded loading is divided into 5 grades of loading, that is, 0.2 times, 0.4 times, 0.6 times, 0.8 times and 1 times the design tension.
[0027] When performing each level of loading and tensioning, determine whether the level of loading and tensioning meets the design requirements by measuring the elongation of the prestressed tendon...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com