Integrated car yard of mine tunneling frontal shunting and moving method
A mine rock and integral technology, which is applied in the mine rock roadway excavation, head-on shunting car yard and mobile field, can solve the problems such as the inconvenient movement of turnouts and tracks, and achieve the effects of avoiding road demolition, improving efficiency, and reducing workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] Such as figure 1 As shown, the head-on shunting yard for mine rock roadway excavation is composed of front and rear turnouts 1 and an empty car track 3 and a heavy car track 7 connected between the front and rear turnouts.
[0017] Such as figure 2 As shown, the front and rear turnouts 1 are integral turnouts connected by the turnout rail 1-1 and the steel plate 1-2 welded below the turnout rail 1-1. Empty car track 3 and heavy car track 7 are spliced by the ladder track 2 that it is connected into by steel rail and the steel plate that is welded on the steel rail below by length requirement.
[0018] In the present embodiment, the track of integral turnout and ladder track is steel rail, and its wide 100mm, thick 8-10mm of the steel plate 1-1 that is welded on the steel rail below. The distance between adjacent steel plates 2-1 is 600-800mm. The ladder track is a 15kg ladder track.
[0019] The front and rear switch 1 are bolted together with the empty track 3 a...