Forecasting-early warning and emergency control method for moving chemical risk source
A technology of emergency control and risk source, applied in the direction of comprehensive factory control, comprehensive factory control, electrical program control, etc., can solve the problems of forecasting, early warning and control of unmovable risk sources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0030] Based on the above technical solutions, the present invention will be described in detail below through specific implementations.
[0031] The specific operation steps of a method for controlling mobile chemical risk sources of protection targets according to the present invention are as follows:
[0032] Step 1. Determine the type and quantity of the material of the mobile risk source and the geographic coordinates of the protection target.
[0033] Step 2: Obtain the wind field and turbulence forecast results in the target risk simulation range. The specific operation steps are as follows:
[0034] Step 1: Apply the global-scale background field T213 as the initial field of MM5, call the GIS data in the area where the protection target is located as the boundary condition, and predict the protection target in the next tens of hours through multi-layer grid nesting and rolling parallel calculation Meteorological field in the area, including wind field, turbulence, temperature ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More