Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

44 results about "Hazard Control" patented technology

Hazard control refers to workplace procedures adopted to minimize injury, reduce adverse health effects and control damage to plant or equipment.

Nuclear hazard forecasting and alarming platform and method based on GIS (Geographic Information System)

ActiveCN102096889ALong durationWide range of influenceForecastingICT adaptationStart timeEngineering
The invention discloses a nuclear hazard forecasting and alarming platform and method based on a GIS (Geographic Information System), belonging to the field of hazard control. The nuclear hazard forecasting and alarming method comprises the following steps of: 1.obtaining forecasting results of a wind field and a turbulence flux; 2. carrying out proliferation simulation on a nuclear hazard; 3. obtaining hazard depth, withdrawing depth, iodine taking depth, hazard area, withdrawing area, iodine taking area, hazard start time and hazard duration time of a nuclear accident; 4. judging whether the hazard depth of the nuclear accident in a set proliferation simulation region is figured out, if the hazard depth is figured out, ending the method, and if the hazard depth is not figured out, returning to the step 2; and 5. forecasting and alarming the nuclear hazard based on the GIS and issuing online in real time. The invention provides a data support for dealing with nuclear crisis, providesa scientific basis for rapidly dealing with the nuclear crisis, and scientifically evaluating the result of the nuclear hazard, thereby guiding the public to rapidly take correct safeguard measures after the public are attacked, eliminating psychological pressure and unnecessary worry and guaranteeing the social stability and the everyday routines.
Owner:中国人民解放军防化指挥工程学院

Optimal control method aiming at nuclear accident loss and emergency action cost

The invention relates to an optimal control method aiming at nuclear accident loss and emergency action cost, belonging to the field of nuclear hazard control. The optimal control method comprises the following steps of: (1) confirming a nuclear accident simulation range; (2) acquiring prediction results of wind filed and turbulent flow of the nuclear accident simulation range; (3) acquiring nuclear accident simulation range data observed by a meteorological observation network at the real time; (4) carrying out assimilation on the prediction results of the field wind and the turbulent flow in the step (2) and the acquired data observed by the meteorological observation network at the real time in the step (3); (5) carrying out diffusion simulation on nuclear accidents; (6) acquiring nuclear accident early-warning information; (7) formulating an optimal control scheme of the nuclear accident loss and the emergency action cost; and (8) providing the optimal control scheme of the nuclear accident loss and the emergency action cost for a commander to make decision. The invention improves the diffusion simulation precision, solves the contradiction between the accident emergency intervention effect and the action cost and improves the solving efficiency of the optimal control problem by more than two magnitude orders.
Owner:中国人民解放军防化指挥工程学院

Hazardous chemical transport hazard predicting and controlling system

InactiveCN103971168AHazard prediction results are accurateSimple calculationForecastingTopographic factorDecision taking
The invention provides a hazardous chemical transport hazard predicting and controlling system. The adjoint mode provided by the hazardous chemical transport hazard predicting and controlling system is set up on the basis of a CAMx diffusion mode and is more suitable to practical diffusion by considering affection of meteorological factors and topographic factors; starting from protective targets, the adjoint mode only needs to solve adjoint equation once to acquire risk value, and time for solving the adjoint equation is equal to time for solving diffusion equation; prediction of hazardous chemical transport coming risks is realized by application of the numerical diffusion mode is realized, practical conditions of transport objects, transport time and transport lines are comprehensively considered, elaborate risk field distribution during practical transport is obtained, blindness of emergency preparation is avoided, and a real-time hazard evaluation mode matched with actual topography, weather, environments and the like is provided, so that hazard control during hazardous chemical transport accidents is more scientific and effective. Accordingly, hazard prediction results are more accurate, hazard prediction efficiency is higher, and hazard control policy is more scientific.
Owner:中国人民解放军防化学院 +1

Anchor rope group and active protective net combined integrated bearing structure

ActiveCN106193070APrevent tear damageAchieve three pre-tensioningExcavationsBulkheads/pilesSurface layerEngineering
The invention discloses an anchor rope group and active protective net combined integrated bearing structure and belongs to the field of mountain hazard control. The anchor rope group and active protective net combined integrated bearing structure comprises an anchor rope group and an active protective net; horizontal supporting ropes and longitudinal supporting ropes of the active protective net form a plurality of unit grids, an anchor pier is surrounded by each unit grid, and the horizontal supporting ropes and the longitudinal supporting ropes pass through connecting holes in connecting devices and cling to the surface of a slope; auxiliary connecting ropes pass through auxiliary connecting holes in the outer ends of connecting plates of auxiliary connecting devices, one end of each auxiliary connecting rope is connected with each longitudinal supporting rope, and the other end of the auxiliary connecting rope is connected with each horizontal supporting rope; and steel rope nets are connected with the connecting ropes, the longitudinal supporting ropes, the horizontal supporting ropes and sewing ropes and are tensioned on the surface of the slope. According to the anchor rope group and active protective net combined integrated bearing structure, the active protective net on a shallow surface layer and the reinforced anchor rope group on a deep layer are integrated to form an integral stress system, and local stress and integral bearing of any part are realized within an active protective net and anchor rope group integrated stress system, so that the protective capability for shallow surface layer reinforcement and deep layer reinforcement of a mountain is greatly improved.
Owner:四川铁拓科技有限公司 +1

Method for managing safe water supply of multiple water resources in city

InactiveCN103541402AGo digitalWater Supply Security GuaranteeWater supply installationCritical control pointMathematical model
Provided is a method for managing the safe water supply of multiple water resources in the city. The method comprises the following steps that (1), on the basis of collecting and systemizing city water supply materials, a water supply system digital network is built, hazard analysis is carried out on a water supply network of a water supply system and control measures are provided; (2), according to a water conservancy and water quality characteristic calculation model, the position of critical points is determined, the critical limit value of the critical control points is made, the control measures of the critical points are cleared, and a critical node mathematical model is built; (3), EPANET software is adopted to calculate the water conservancy and water quality characteristics of the critical points, a multi-water-source city safe water supply management system is built, and basic data support is provided for hazard control of the critical points. The method has the advantages of being capable of achieving digital management on the water supply system, clearing out the problems existing in the network, carrying out necessary modification on the network, achieving the best water supply management effect through the minimum consumption of manpower resources and energy, and ensuring water supply safety of the city.
Owner:天津市滨海新区大港节约用水事务管理中心 +1

Mine production potential safety hazard control method and device and electronic equipment

The invention discloses a mine production potential safety hazard control method and device and electronic equipment, and belongs to the technical field of production safety prevention and control. The mine production potential safety hazard control method comprises the steps: obtaining potential safety hazard information of the mine production potential safety hazards; determining a hidden danger level of the hidden danger information according to a safety operation standard; and sending the mine production potential safety hazard to the supervision department of the corresponding potential hazard level, so that the supervision department supervises the rectification department to rectify. According to the method, the hidden danger level of the hidden danger information is determined according to the safety operation standard, and the mine production safety hidden danger is sent to the supervision department of the corresponding hidden danger level, so that the supervision department supervises the rectification department for rectification. According to the method, the rectification process of the mine production potential safety hazard can be standardized and normalized, and a supervision department supervises and rectifies the mine production potential safety hazard, so that danger of mine production caused by the fact that the rectification department is neglected of duty and does not rectify the mine production potential safety hazard is prevented.
Owner:CHINA ACAD OF SAFETY SCI & TECH +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products