Control method for delaying coking process
A coking process and coking tower technology, which is applied in the coking of carbon-containing materials, coke ovens, petroleum industry, etc., can solve the problems of gate valve or ball valve being easy to coke, increasing equipment investment cost, and expensive ball valve or gate valve.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0024] in such as figure 1 In the delayed coking process shown,
[0025] (1) Thermal coking oil, about 500°C, about 200 tons / hour, is fed into the coking tower 1 from the bottom of the coking tower 1 for coking,
[0026] (2) The volume of coking tower 1 is about 1800m 3 , the tower diameter is The operating temperature is 450-490°C, the operating pressure is 0.1-0.3MPa(g), and the coking time is 20 hours. After the coking reaction is completed, the coking tower 1 filled with coke is steamed to remove the residual volatile matter in the coke bed in the tower. hydrocarbons. Steam blowing for about 2 hours, after the hydrocarbons that can be blown out are blown out, the tower is filled with cold coke water for cold coke. The water is then drained out of the tower, the coke bed is cut, the coke is removed from the bottom of the tower, and the upper end caps are reinstalled. Carry out the next coking operation.
[0027](3) While adding hot coker oil to the bottom of the abov...