Determination method of initial completion initial cable force of cable-stayed bridge
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- WUHAN UNIV OF TECH
- Publication Date
- 2012-02-08
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
Technical field
[0001] The present invention belongs to the transportation industry bridge culvert project, which specifically involves a method of initial force of the initial force of the Cymbly Bridge Chengqiao Bridge based on the ANSYS platform. Background technique
[0002] Large -span dense cable bridge is a high -end ultra -static system. The geometric geometric non -linear effect is significant, and the number of cables is large.In its extreme carrying capacity analysis, first of all, a set of initial cables need to be provided, so that under the action of Chengqiao Henglian, the request is consistent with the designer or actual measurement.Sometimes it can't even converge.At present, the existing life and death unit method is to use the characteristics of the unit of life and death to directly apply a pair of concentration to the nodes at both ends of the cable cable.The vertical effect of Laoso has a large error between the computing obtained bridge cable force and the ...