Determination method of initial completion initial cable force of cable-stayed bridge

A determination method and technology for cable-stayed bridges, applied in special data processing applications, instruments, electrical and digital data processing, etc. Practical engineering application value, improving solution accuracy and efficiency, and the effect of small calculation errors
CN101937485BActive Publication Date: 2012-02-08WUHAN UNIV OF TECH

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
WUHAN UNIV OF TECH
Publication Date
2012-02-08

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention relates to a determination method based on an ANSYS second development platform of the initial completion initial cable force of a cable-stayed bridge. The method uses the design cable force as the target value, considers the geometric non-linear effect and performs iteration for solving and correcting the cable initial strain under the action of dead load. The method comprises the following specific steps: any group of cable forces is assumed to be added on the stay cable in the mode of initial strain, dead load is added to calculate, the *do-loop command language is used to extract the calculated cable force of the stay cable and check whether the error between the cable force and the target completion cable force is within an available limit; if the error is large, the indifference method is used to correct the stay cable initial strain, then the error is calculated again until the error is within the available limit; and the initial completion initial cable force canbe obtained by multiplying the last calculated group of stay cable initial strains by the elastic modulus of the stay cable which is corrected by considering the vertical effect. By using the method,the solving time of the completion initial cable force of the cable-stayed bridge can be reduced and the precision can be increased, thus the method has large practical engineering application value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field

[0001] The present invention belongs to the transportation industry bridge culvert project, which specifically involves a method of initial force of the initial force of the Cymbly Bridge Chengqiao Bridge based on the ANSYS platform. Background technique

[0002] Large -span dense cable bridge is a high -end ultra -static system. The geometric geometric non -linear effect is significant, and the number of cables is large.In its extreme carrying capacity analysis, first of all, a set of initial cables need to be provided, so that under the action of Chengqiao Henglian, the request is consistent with the designer or actual measurement.Sometimes it can't even converge.At present, the existing life and death unit method is to use the characteristics of the unit of life and death to directly apply a pair of concentration to the nodes at both ends of the cable cable.The vertical effect of Laoso has a large error between the computing obtained bridge cable force and the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More