Determination method of initial completion initial cable force of cable-stayed bridge
A determination method and technology for cable-stayed bridges, applied in special data processing applications, instruments, electrical and digital data processing, etc. Practical engineering application value, improving solution accuracy and efficiency, and the effect of small calculation errors
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] The present invention provides a method of initial force determining the initial force of the Cymbly Bridge Chengqiao Bridge based on the ANSYS platform. This method uses the design cable as a target value, considers the geometric non -linear effect, and repeatedly iterates to solve and modify the initial response of the pull cable under the action of constant load.This method is specifically: the first set of initial force is added to the form of the initial response to the cable cable, plus the constant load (the first phase of the height load and the second phase of the heir) and the calculation of the calculation income cable cable SusoForce and check whether the error between the force and the target to make a bridge is within the allowable range. If the error is too large, modify the initial response of the cable cable through the difference method, and then re -calculate that the error is within the allowable range. The last time is the last timeA set of claim cables...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com