Oil gas recovery method
A recovery method, oil and gas technology, applied in the direction of separation methods, chemical instruments and methods, containers, etc., to achieve the effects of simple process, good absorption effect, equipment investment and operation cost reduction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] A gas oil storage tank area and a waste oil tank area discharge exhaust gas, the temperature is about 40°C, and the total oil gas concentration is 9×10 4 ~40×10 4 mg / m 3 , the sulfide concentration is 1000mg / m 3 about. First use sodium hydroxide solution to absorb and remove sulfide, after the sodium hydroxide solution absorbs, the sulfide concentration is lower than 10mg / m 3 , and then absorb the slick oil in the grease trap of the sewage treatment plant.
[0019] The absorption treatment device adopts a packed tower, and the packing is Φ25mm×25mm×2mm stainless steel Pall ring packing. The exhaust gas enters the packed tower from the bottom of the packing layer, and the slick oil enters the packed tower from the upper part of the packing layer. The gas is discharged from the top of the tower for further processing; the slick oil absorbing oil and gas is discharged from the bottom of the tower for further processing.
[0020] The operating conditions of the packed ...
Embodiment 2
[0022] A certain gasoline oxidative sweetening tail gas and liquid hydrocarbon oxidative sweetening tail gas, the temperature is about 40°C, and the total hydrocarbon concentration is 30×10 4 ~80×10 4 mg / m 3 .
[0023] A bubble tower is adopted, and a gas distributor is set in the middle of the bubble tower for secondary gas-liquid contact distribution. The slick oil enters the bubble tower from the top of the tower, and the slick oil that absorbs oil and gas is discharged from the bottom of the tower. Oxidative sweetening tail gas enters the bubble column from the bottom of the tower, and is discharged from the top of the tower. The volume space velocity of the waste gas is 1000h -1 , the liquid-gas ratio is 70L / m 3 , After 12 hours of stable operation, the oil and gas recovery rate reaches 85% to 90%.