Preassembly-free manufacturing process for main beam of large gantry crane
A manufacturing process and gantry technology, which is applied in the pre-assembly process of the main girder of the gantry crane. It can solve the problems that the pre-assembly process occupies a large area, it is difficult to lift out the tire frame in sections, and the working surface cannot be unfolded. easy effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0010] like figure 1 , figure 2 Shown includes: the main girder is a box structure, including top cover plate 1, bottom plate 2, web plates 3 on both sides, and internal frame structure. The specific structure is as follows: webs 3 are arranged on both sides of the top cover 1 and the bottom 2 , and aggregates are arranged inside the top cover 1 , bottom 2 and web 3 . In this process, the height of the main girder is 12000mm, the width of the top cover plate is 5000mm, and the width of the bottom plate is 2950mm.
[0011] When setting out, place a 30mm-50mm process allowance in the top cover plate 1, the bottom plate 2, the longitudinal structure of the internal aggregate, and the lower openings of the web plates on both sides. The top cover plate 1, the bottom plate 2, and the web plates 3 on both sides are respectively assembled and welded with the corresponding internal aggregates to form plate unit parts. The margins at both ends of the top cover plate 1 and bottom pla...