Shale gas bridge plug subsection completion method

A shale gas and bridge plug technology, which is applied in earthwork drilling, wellbore/well components, production fluids, etc., can solve problems such as complicated process, prolonging construction period, and limited number of sections, and achieves simplified well completion procedures, The effect of saving construction time and shortening the completion period

Active Publication Date: 2012-11-14
CHINA PETROLEUM & CHEM CORP +1
View PDF3 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] (1) Casing, cementing, and multi-stage separation of fracturing stages with combined plugs; this method is complex and the number of stages is limited (only 2-6 stages)
[0007] (2) Use flexible tubing or buckle-connected tubing to supply water or sandblast the perforated pay zone at each stage; the process is complicated, with long construction period and high cost
In the existing technology, it is necessary to use tubing to run conventional tools to realize perforation, isolation and fracturing step by step, which not only prolongs the construction period, but also limits the channels for later fracturing and production, and at the same time, it is impossible to realize multi-stage and staged well completion

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Shale gas bridge plug subsection completion method
  • Shale gas bridge plug subsection completion method
  • Shale gas bridge plug subsection completion method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] Below in conjunction with accompanying drawing, the present invention is described in further detail:

[0040] 1. Completion string structure

[0041] Such as figure 1 As shown, the present invention uses shale gas bridge plug completion string from bottom to top mainly including drillable bridge plug 5, E-setting tool 4 and perforating gun 3, wherein, drillable bridge plug 5 It is connected with the E-setting tool 4 through plugging and pins, and the perforating gun 3 is connected with the E-setting tool 4 through threads. E-setting tool is a tool for setting plug, its function is to provide mechanical power for bridge plug setting, E means to start by cable transmission and electric ignition. The completion string is lowered into the shale gas well casing 1 through the transmission cable 2, and its specific position is determined according to the construction design of the gas well completion.

[0042] 2. A shale gas bridge plug completion method in stages

[0043...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a shale gas bridge plug subsection completion method and belongs to the field of unconventional oil-gas reservoir well completion projects. The shale gas bridge plug subsection completion method comprises firstly using a hydraulic pump to transmit a widowmaker and a drilling removing type bridge plug to an objective layer section in a gas well through a hydraulic pump to conduct perforation, fracture and seat sealing interaction, then conducting the perforation, the fracture and the seat sealing interaction on a next objective layer section and achieving well completion of each objective layer section; and finally drilling a multistage bridge plug through a drilling and milling tool through a continuous oil tube, building production layer channels and conducting well completion operation. The shale gas bridge plug subsection completion method meets requirements for shale gas development well-case perforation completion, provides a solid well wall and a channel for communicating production layers for later stage construction, meets well completion requirements for multistage segmentation of a shale gas horizontal development well, can achieve sealing and separation of a lower bridge plug, perforation and fracture process seat interaction, simplifies well completion procedures, saves construction time, can drill the multistage bridge plug at one time in the drilling removing type bridge plug, and effectively shortens well completion periods.

Description

technical field [0001] The invention belongs to the field of well completion engineering of unconventional oil and gas reservoirs, and in particular relates to a shale gas bridge plug well completion method in stages. Background technique [0002] With the rapid development of the world economy and the rising demand for oil and gas, shale gas, as an unconventional oil and gas resource, has been continuously discovered and proven, and its economic value and strategic significance have been increasingly valued by various countries. At present, the total amount of shale gas in the world is 456×10 12 m 3 , China is very rich in mud shale, with reserves of about 456×10 12 m 3 As an important part of China's oil and gas resources development strategy, shale gas drilling and development have been gradually started, and it will be of great significance to study its supporting technology. Due to the poor physical properties and low porosity and low permeability of shale gas reser...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21B43/14E21B43/26E21B33/10E21B33/13E21B29/00
Inventor 何祖清马开华丁士东姜向东郭朝辉安生赵旭张强吴俊霞
Owner CHINA PETROLEUM & CHEM CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products