The technology of fire hose and production process is applied in the field of production process of fire hose with lining, which can solve the problems of poor firmness of liner and belt blank, affecting product quality and high production cost, saving manpower and improving product quality. , the effect of saving floor space

Active Publication Date: 2016-01-20
光大消防器材(南通)有限公司
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The fire hose is a hose used to transport high-pressure water or foam and other flame-retardant liquids. At present, the most used fire hoses have rubber liners inside, and the processing technology of fire hoses with liners is as follows: first, according to the needs Cut the braided blank into a certain length, then pull the liner of matching size into the blank, then fill the blank with air and clamp both ends of the blank, and then put the blank into a certain The steam under pressure makes the liner and the billet thermally bonded. This process has the following disadvantages: 1. The clamping parts at both ends of the billet cannot be heated, so the gas bands at both ends need to be cut off, resulting in waste; 2. The liner is pulled in The inside of the blank is more difficult, time-consuming and labor-intensive; 3. The outer diameter of the required liner is smaller than the inner diameter of the blank, resulting in poor firmness between the liner and the blank, which affects product quality; 4. The workbench used for processing is relatively large, Large area and high production cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0013] Assuming that the wall thickness of the blank woven in this embodiment is 1.5mm, the inner diameter is 50mm, the thickness of the liner is 1.0mm, the required length of the hose is 30m, and the working pressure is 1.0MPa, then its production process: first select the liner required above The wall thickness of the liner is 1.0mm, the outer diameter is 50mm, and then the selected liner is braided into the strip blank according to the above requirements to form a blank tube. After the blank tube braiding length exceeds 30m, the blank tube can be heat-sealed. That is to say, tie the blank tube with a roller I at a certain size from the head end of the blank tube (as long as the final distance between the roll I and the roll II can be greater than the length of the oven), and then fill the blank tube from the head end of the blank tube. Air, after the air is full, tie the head end of the billet tube tightly with roll II, and then move the roll II to the direction of roll I, f...

Embodiment 2

[0015] Assuming that the wall thickness of the blank woven in this embodiment is 2.0mm, the inner diameter is 50mm, the thickness of the liner is 1.5mm, the required length of the hose is 40m, and the working pressure is 1.3MPa, then its production process: first select the liner required above The wall thickness of the liner is 1.5mm, the outer diameter is 50mm, and then the selected liner is braided into the strip blank according to the above requirements to form a blank tube. After the blank tube braiding length exceeds 40m, the blank tube can be heat-sealed. That is to say, tie the blank tube with a roller I at a certain size from the head end of the blank tube (as long as the final distance between the roll I and the roll II can be greater than the length of the oven), and then fill the blank tube from the head end of the blank tube. Air, after the air is full, tie the head end of the billet tube tightly with roll II, and then move the roll II to the direction of roll I, f...

Embodiment 3

[0017] Assuming that the wall thickness of the strip woven in this embodiment is 1.8mm, the inner diameter is 65mm, the thickness of the liner is 1.2mm, the required length of the hose is 25m, and the working pressure is 0.8MPa, then its production process: first select the liner required above The wall thickness of the liner is 1.2mm, the outer diameter is 65mm, and then the selected liner is braided into the strip blank according to the above requirements to form a blank tube. After the blank tube braiding length exceeds 25m, the blank tube can be heat-sealed. That is to say, tie the blank tube with a roller I at a certain size from the head end of the blank tube (as long as the final distance between the roll I and the roll II can be greater than the length of the oven), and then fill the blank tube from the head end of the blank tube. Air, after the air is full, tie the head end of the billet tube tightly with roll II, and then move the roll II to the direction of roll I, f...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a production process for fire hoses with linings. The production process is characterized by including braiding a lining tube into a hose blank to form a blank tube according to production specification requirements, treating the blank tube through a process of heat sealing after the length of the braided blank tube is capable of meeting production requirements, cooling the blank tube to obtain a finished product, and finally cutting off the finished product according to required production dimension so as to obtain fire hoses with required lengths. The production process has the advantages that the production process is simple and capable of realizing continuous production, and labor is saved while waste is reduced.

Description

technical field [0001] The invention relates to a production method of a fire-fighting hose, in particular to a production process of a lining-lined fire-fighting hose. Background technique [0002] The fire hose is a hose used to transport high-pressure water or foam and other flame-retardant liquids. At present, the most used fire hoses have rubber liners inside, and the processing technology of fire hoses with liners is as follows: first, according to the needs Cut the braided blank into a certain length, then pull the liner of matching size into the blank, then fill the blank with air and clamp both ends of the blank, and then put the blank into a certain The steam under pressure makes the liner and the billet thermally bonded. This process has the following disadvantages: 1. The clamping parts at both ends of the billet cannot be heated, so the gas bands at both ends need to be cut off, resulting in waste; 2. The liner is pulled in The inside of the blank is more diffi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): B29C63/34
Inventor 陆忠跃
Owner 光大消防器材(南通)有限公司