Overall prepressing device for hanging basket
An integral, bottom-basket technology, applied in the erection/assembly of bridges, bridges, buildings, etc., can solve the problems of being greatly affected by wind loads, high labor intensity, and troublesome procedures.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0032] The present invention will be described in more detail below through specific examples.
[0033] 1. Project Background
[0034] The main bridge of the bridge is a continuous box girder, and the bridge span is composed of a single box and single room continuous beam of 40m+3*70m+40m. The top width of the box girder is 13m, the length of the flange plate is 3.45m, the beam height at the fulcrum is 4.2m, and the height of the mid-span beam is 2.2m. The beam height and bottom plate thickness change according to a quadratic parabola. The thickness of the web is 70cm-50cm (the thickness of the web at the fulcrum is 70cm), the thickness of the bottom plate is 110cm-30cm (the thickness of the bottom plate at the fulcrum is 110cm), and the thickness of the top plate is 28cm.
[0035] The pouring of the box girder is divided into 8 stages, in which the length of the 0# beam section is 10m, and the length of the closing section is 2.0m. 4.5m. The length of the closing section is ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 