Progress Analysis Method for Multilevel Network Planning

An analysis method and level network technology, applied in the field of progress analysis of multilevel network plans, can solve problems such as application limitations, inability to clearly express activity dependencies, and difficulty in showing the full picture of large and complex projects.

Active Publication Date: 2015-10-28
北京神舟航天软件技术股份有限公司
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, it has obvious planning and subjectivity, it is difficult to show the whole picture of large and complex projects, it cannot clearly express the dependencies between activities, and it cannot express the relative importance of individual activities in the project, so its application is limited. limit

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Progress Analysis Method for Multilevel Network Planning
  • Progress Analysis Method for Multilevel Network Planning
  • Progress Analysis Method for Multilevel Network Planning

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The present invention discloses a progress analysis method of multi-level network planning based on the multi-level network planning model, which is based on the planned start time, planned completion time and planned duration of each plan, and according to the pre-post relationship between plans and parent-child Constraints, calculate the expected start time, expected completion time and planned duration of each plan. Based on this, users can find the critical path, systematically analyze the longest duration of the project, the probability of completing the project on time and other important indicators, thus, Use the network optimization method to achieve the purpose of saving cost and shortening the construction period. On the basis of this method, through the application of the self-developed calculation and analysis engine and the integration of third-party graphical display controls, the AVPLAN project management platform based on Shenzhou Software has realized th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a multistage network planned schedule analysis method based on a multistage network planning model, which firstly establishes the multistage network planning model and comprises the following steps: (1) extracting a multistage network plan; (2) arranging a front and rear arrangement relation of the plan; (3) arranging a planning proposal mode; (4) carrying out loop checking to check whether the front and rear arrangement relation of the plan forms a loop or not; (5) executing schedule calculation; and (6) recording the schedule calculation result. According to the invention, on the basis of plan starting time, plan completion time and plan construction period of each plan, the expected starting time, the expected completion time and the plan construction period of the plan are calculated according to the front and rear arrangement relation of the plan and father and son constraint; and on the basis of the expected starting time, the expected completion time and the plan construction period, users can search a critical path, and systematically analyze the longest construction period of the item, the probability of finishing the item on the schedule and other important indices, so as to achieve the purposes of saving cost and shortening the construction period by utilizing a network optimization method.

Description

technical field [0001] The invention relates to a progress analysis method of multi-level network planning. Background technique [0002] As we all know, aerospace model engineering is a group management engineering project with very complicated collaboration and difficult risk control. With the vigorous development of my country's aerospace industry, the scale of the project is becoming more and more complex, and there are more and more factors restricting the project. The pressure to seek benefits through detailed management is increasing. In this case, how to smoothly advance the project progress, make the project carefully controlled within the scope of the plan, and ensure that the project achieves its goals "faster and better" is an urgent problem to be solved. At present, in the project management software market, Primavera's P3, P6, Microsoft's Project, etc. are widely used. However, in terms of schedule calculation, P3 and P6 do not yet support the schedule calcul...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06F19/00
Inventor 陈凡胡杨博王学敏王泉泉
Owner 北京神舟航天软件技术股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products