A closed-loop detection and verification method for power grid automatic power generation control
A technology of automatic power generation control and verification method, which is applied in the field of power system, can solve the problems of lack of effective means, no good digital and analog detection tools, and different AGC control effects, so as to avoid the effect of development work
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0075] Taking a provincial power grid model as an example, the AGC performance of China Electric Power Research Institute was tested and verified. The initial relevant parameters of AGC calculation are shown in Table 1:
[0076] Table 1 AGC calculation initial related parameters
[0077] coefficient name
constant value
Regional frequency deviation coefficient B
30MW / 0.1HZ
Rated frequency f 0
50HZ
Regional tie line program power P 0
1400MW
initial section load
23565MW
initial section power generation
23562MW
initial section frequency
49.99HZ
Initial cross-section tie line power
1364MW
ACE adjusts the dead zone range
-10MW~10MW
[0078] Calculate the initial section ACE=10*30*(49.99-50)+(1364-1400)=-39MW.
[0079] Calculation example 1: Set grid load disturbance, increase grid load by 15MW without changing grid power generation, perform power flow calculation to updat...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com