Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A method for dynamic adjustment of tree structure time delay in deep signal coverage

A tree structure, signal coverage technology, applied in the direction of optical fiber radio, optical fiber transmission, etc., to achieve the effect of short time required, high accuracy, and scalable new strength

Active Publication Date: 2016-09-14
WUHAN HONGXIN TELECOMM TECH CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to overcome the shortcomings and deficiencies of the prior art, aiming at signal coverage in large-area buildings, and solve the problem of time delay adjustment in signal coverage of complex tree topological structures

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method for dynamic adjustment of tree structure time delay in deep signal coverage
  • A method for dynamic adjustment of tree structure time delay in deep signal coverage
  • A method for dynamic adjustment of tree structure time delay in deep signal coverage

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] The technical solutions of the present invention will be described below in conjunction with the accompanying drawings and embodiments.

[0018] The equipment that constitutes the tree structure in the embodiment includes:

[0019] Remote Radio Unit (RRU): A low-power radio unit that provides final signal coverage and is the leaf node of the entire tree topology.

[0020] Near-end source access unit (AU): As the root of the tree topology, it is responsible for base station source access. After digital processing, it is divided into multiple channels and extended to the optical port. At the same time, the maximum delay value of the entire network is also calculated by the AU. Broadcast to all RRUs.

[0021] Extension unit (EU): responsible for accessing information sources from the AU side or the upper-level EU side, and plays the role of essentially managing the RRU.

[0022] The method for dynamically adjusting the delay in a tree structure provided by the embodiment...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A method for dynamically adjusting the delay of a tree structure in deep signal coverage, including obtaining the fiber delay value from the tree root node to itself for each node in the tree structure, and counting the maximum fiber delay from the tree root node to the last stage of the link value, as the maximum fiber link delay of the entire network; the root node of the tree is used as a reference point for delay adjustment, and the root node broadcasts the maximum fiber link delay of the entire network to each leaf node, and each leaf node calculates the maximum fiber link delay of the entire network respectively. The difference Ta between the link delay and the fiber delay value from the tree root node to itself, and the difference between Ta and its own current set delay value Ts, if the absolute value of the difference is 0 or less than the preset threshold, then no It needs to be adjusted, otherwise, replace the set delay value from Ts to Ta. The invention solves the problem of time delay adjustment in signal coverage of complex tree topological structure, has high precision, short time required for whole network adjustment, can be expanded and improved, and the impact of time delay adjustment on adding or removing branches to the topological network is minimized .

Description

technical field [0001] The invention belongs to the technical field of telecommunication, and in particular relates to a time delay adjustment method adopted in signal coverage in near and far end digital repeaters connected by optical fibers. Background technique [0002] Each set of traditional digital optical fiber repeater consists of a near-end device AU and multiple remote radio equipment RRU connected by optical fiber. Each near-end includes multiple remote optical ports, and each remote optical port can drag a A cascaded radio frequency link formed by optical fiber physical connection at the two remote ends realizes open signal coverage for different distance areas; due to the characteristics of radio frequency signal coverage, there must be overlapping coverage areas of two or more RRUs in order to achieve no dead angle coverage , if delay adjustment is not performed, user terminals in this area may be unusable. Existing delay adjustment is mainly used in single-cha...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H04B10/2575
Inventor 高国庆欧文军张文成
Owner WUHAN HONGXIN TELECOMM TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products