Lifting system and method for gravel transfer and lifting in vortex cavern construction
A technology for caverns and gravel, which is applied in the field of gravel transfer and lifting systems, can solve problems such as hidden safety hazards, low efficiency, and crowded caverns in construction operations, and achieve the effects of improving transportation efficiency, convenient operation, and ensuring safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] Such as Figure 1-2 As shown in , a gravel transfer lifting system and method for vortex cavern construction, including cavern crane 1, loading vehicle 6 and shaft top crane 12, cavern crane 1 is installed in the cavern at the top of the vertical section 16 of the cavern On the driving running guide rail 4 of the truss 19, the loading vehicle 6 is installed on the loading vehicle running guide rail 8 located in the straight section 15 of the cavern. One end of the loading vehicle 6 is connected with the loading vehicle traction device 11 through a traction rope, and the loading Car 6 is also provided with hydraulic self-unloading device, shaft top driving 12 is arranged on the outside of shaft top, and shaft bottom is provided with unloading pit 9.
[0021] With this structure, the construction stone slag 17 in the vortex cavern can be vertically hoisted into the loading vehicle 6 installed in the straight section 15 of the cavern by the cavern crane 1 arranged on the t...
Embodiment 2
[0027] Using the transfer lifting system involved in embodiment 1 to carry out the method for transferring and lifting the eddy current cavern construction gravel, the steps are:
[0028] 1. Put the construction gravel 17 in the vortex tunnel into the first hanging basket 5;
[0029] 2. The cavern crane 3 on the cavern crane 1 vertically lifts the first hanging basket 5 with the construction gravel 17 at the bottom of the vortex cavern, and then horizontally transports the construction gravel 17 to the cavern along the running guide rail 4. On the loading cart 6 in the straight section 15 of the chamber;
[0030] 3. The loading vehicle 6 moves along the loading vehicle running guide rail 8 through the loading vehicle traction device 11 to the loading vehicle stopper 7 near the unloading pit 9 at the bottom of the shaft, and stops at 7, and unloads to the first through the hydraulic self-unloading device In the second hanging basket 10, after the unloading is completed, the tr...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com
