Composite root puncture resistant waterproof membrane for planting roof and preparation method thereof
A root puncture-resistant, waterproofing membrane technology, applied in the direction of roofing, roof covering, roofing using flexible materials, etc., can solve the problem that the waterproofing membrane cannot meet the requirements, achieve good waterproofing effect, avoid damage, and ensure waterproofing requirements Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] a. Preparation of asphalt layer: take 1300kg10 # Asphalt and 900kg90 # Raise the temperature of the asphalt to 195°C, then add 900kg of 40-mesh nylon rubber powder while stirring, raise the temperature to 250°C, stir at constant temperature for 2.5 hours, cool down to 185°C, add 200kg of engine oil, stir for 10 minutes, then add 100kg of SBS, 200kg of APP and 100kg of IPP, at 180°C Stir at 180°C for 1 hour, then grind for 1 hour, then add 1400kg of 200-mesh stone powder and 50kg of chemical root inhibitor, and stir at 180°C for 1.5 hours to obtain the prepared asphalt layer;
[0025] b. Evenly cover the asphalt layer prepared above on the long-fiber polyester fiber mat, and then cover the asphalt layer with a high-density strong cross film.
Embodiment 2
[0027] a. Preparation of asphalt layer: take 900kg10 # Asphalt and 1300kg90 # Raise the temperature of the asphalt to 200°C, then add 900kg of 40-mesh steel wire tire rubber powder while stirring, raise the temperature to 260°C, stir at constant temperature for 2 hours, cool down to 185°C, add 300kg of engine oil, stir for 5 minutes, then add 200kg of SBS, 100kg of APP, Stir at 180°C for 1 hour, then grind for 1 hour, then add 1400kg of 200-mesh stone powder and 50kg of chemical root inhibitor, and stir for 1 hour at 175°C to obtain the prepared asphalt layer;
[0028] b. Evenly cover the asphalt layer prepared above on the composite copper base, and then cover the asphalt layer with high-density strong cross film.
[0029] 10 # Bitumen 900 parts, 90 # 1300 parts of asphalt, 900 parts of rubber powder, 200 parts of SBS, 100 parts of APP, 300 parts of engine oil, 1400 parts of stone powder, 50 parts of chemical root inhibitor.
Embodiment 3
[0031] a. Preparation of asphalt layer: take 1500kg10 # Asphalt and 700kg90 # Raise the temperature of the asphalt to 200°C, then add 600kg of 80-mesh nylon rubber powder while stirring, raise the temperature to 255°C, stir at constant temperature for 2 hours, cool down to 190°C, add 400kg of engine oil, stir for 5 minutes, then add 50kgSBS, 250kgAPP and 150kgIPP, at 185°C Stir for 1.5 hours at ℃, then grind for 1.5 hours, then add 1000kg of 200-mesh stone powder and 20kg of chemical root inhibitor, and stir for 1 hour at 185℃ to obtain the prepared asphalt layer;
[0032] b. Evenly cover the asphalt layer prepared above on the composite copper base, and then cover the asphalt layer with high-density strong cross film.