Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

81results about How to "Improve waterproof effect" patented technology

On-site production and construction device for waterproofing treatment

The invention discloses an on-site production and construction device for waterproofing treatment. The on-site production and construction device comprises a frame, wherein an oil pan and an oiled frame are arranged on one side of the frame; an oiled roller is arranged on the oiled frame; the oiled roller is located at the bottom of the oil pan; an embroidery cloth roller is arranged at the end part, which is located on one side of the oil pan, of the frame, and a transmission roller is arranged at a position, which is located on the other side of the oil pan, on the frame; a laminating roller is arranged beside the transmission roller; a raw material base cloth roller is arranged at a position, which is located below the laminating roller, at the middle part of the frame; a surface film roller is arranged at a position, which is located beside the raw material base cloth roller, on the frame; a steering wheel is arranged at each of the upper and lower end parts of the other side of the frame; and a pressing roller is further arranged below the oil pan. A coating material of the on-site production and construction device realizes subdivision of coiled waterproof raw materials; the coating quality is high, and the materials are optional and controllable; compared with an existing coiled material, the coating material has the advantages that a base film does not need to be torn off or roasted with fire, so that energy conservation and environmental protection are realized; the coating material is paved on a base surface and is molded at one time, so that the phenomenon that the construction is carried out for multiple times is avoided, and the labor is saved; and besides, the paved coiled material does not crinkle, and the landing edge does not crack. The coating device can be used for paving a hot-molten waterproof material, a normal-temperature cold coating material, a water-based material and the like.
Owner:邹尚庆

Multifunctional charging pile

The invention provides a multifunctional charging pile, and belongs to the technical field of charging. The multifunctional charging pile comprises a charging pile body, wherein a fixed seat is arranged at the bottom of the charging pile body; a first protective cover is fixedly mounted at the upper end of the front surface of the charging pipe body; a display screen is fixedly mounted at a position, which is close to a position below the first protective cover, on the front surface of the charging pile body; and a magnetic card port is formed in a position, which is close to a position belowthe display screen, on the front surface of the charging pile body. By the arrangement of the first protective cover, rainwater is prevented from entering the display screen, the magnetic card port and a control switch; by the arrangement of a second protective cover, a charging gun and a wire are protected; in raining, the charging gun is plugged into a charging gun socket; a first antiskid pad achieves an effect of preventing the charging gun from sliding off; an electric telescopic rod pushes the second protective cover; and under the united action of a first connection piece and a second connection piece, a closed space is formed between the second protective cover and the charging pile body; a sealing pad achieves a sealing effect.
Owner:LUSHAN COLLEGE OF GUANGXI UNIV OF SCI & TECH

Construction device for building waterproof layer

The invention relates to building waterproof construction, and in particular relates to a construction device for a building waterproof layer. The device comprises a trolley, the upper side of the trolley is fixedly connected with a supporting base plate, the upper side of the supporting base plate is fixedly connected with an air source box, an air bottle is arranged in the air source box, one side of the supporting base plate is rotationally connected with a base plate, one end of an electric push-pull rod is hinged and fixed to one side of the air source box, the other end of the electric push-pull rod is hinged and fixed to the base plate, and the electric push-pull rod controls the base plate to rotate along one side of the supporting base plate. According to the invention, a waterproof coiled material is laid through the walking of the trolley. The connection between the laid waterproof coiled materials is good, the waterproof effect of the waterproof coiled material is effectively improved. The device can rapidly replace the waterproof coiled material, the waterproof coiled material can be secondarily heated and rolled after laying is completed, the waterproof coiled material can be well adhered to the surface of a building, and the number of constructors can be reduced while the construction efficiency is improved.
Owner:烟台蒙特防水材料有限公司

Repairing process for water leakage of parapet wall

The invention relates to a repairing process for water leakage of a parapet wall. The repairing process comprises the following steps that S1, the wall root of a parapet wall body and the ground are excavated to a structural layer; S2, the groove walls of a horizontal construction groove and a vertical construction groove are coated with waterproof layers, and then waterproof coiled materials adhere to the upper portions of the waterproof layers; S3, a waterproof plate is in lap joint with the horizontal groove wall of a lap joint groove, the waterproof plate is pressed against the positions, located in the lap joint groove, of the waterproof coiled materials, a waterproof skirt edge abuts against the positions, located in the vertical construction groove, of the waterproof coiled materials, and a grouting groove is formed between the waterproof plate and the waterproof coiled materials; S4, slurry is injected into a grouting groove through slurry passing through grooves until the slurry flows out of the last slurry passing through groove; and S5, the abutting side of the waterproof plate and the waterproof coiled materials is sealed, and finally the surface of the waterproof plate and the exposed surfaces of the waterproof coiled materials are coated with protective surface layers. According to the repairing process, the water leakage part of the parapet wall can be well repaired, and the construction efficiency is high.
Owner:NANJING KUNJIA WATERPROOF ANTICORROSIVE HEAT PRESERVATION ENG

Thermal-insulation soundproof assembly type building wall body

The invention belongs to the technical field of assembly type buildings, and particularly relates to a thermal-insulation soundproof assembly type building wall body. In order to solve the problem that noise-reduction soundproof effect of an assembly wallboard in the prior art is poor, the invention discloses the following scheme: the thermal-insulation soundproof assembly type building wall bodycomprises a thermal-insulation frame of a structure in the form of Chinese character hui, wherein the two ends between the top of the thermal-insulation frame and the inner wall of the bottom are fixedly provided with thermal-insulation boards; the two ends of the thermal-insulation are fixedly provided with an inner veneer and outer veneer separately; ends, close to the thermal-insulation boards,of the inner veneer and the outer veneer are separately provided with waterproof paint and waterproof glue; a cavity is arranged between the two thermal-insulation boards; fixed plates which are distributed at equal distance in the vertical direction are fixedly arranged between the two thermal-insulation boards; and foam boards are arranged between the thermal-insulation boards and the fixed plates. According to the thermal-insulation soundproof assembly type building wall body disclosed by the invention, the fixed plates are arched towards one end of the inner veneer, so that external noises are conducted to an arc-shaped surface from the planes of the foam boards to reduce noise influences; and moreover, noises at planar ends of the foam boards are dispersed and propagated through a guide slot, so that noise-reduction effect of the assembly wall body is improved.
Owner:陈春艳

Preparation method of silane microencapsulated solid powder waterproofing agent

InactiveCN108002741AImproved resistance to chloride ion penetrationImprove waterproof effectChemistryEmulsion
The invention discloses a preparation method of silane microencapsulated solid powder waterproofing agent. According to the preparation method, by using hydrophilic polyvinylpyrrolidone and maltodextrin as a wall material, a silane monomer is wrapped in the wall material to form microencapsulated droplets through an emulsification and encapsulation technology, and a spray drying technology is adopted to obtain silane microencapsulated powder, so that the stability of TEOS (tetraethoxysilane) in use is effectively improved; when the TEOS is used for mixing of an aqueous solution of a waterproofcoating, the waterborne microencapsulated wall material can be rapidly dissolved into water to release a silane emulsion, and the silane emulsion is combined with the surface of a cement-based material to form a layer of reticular hydrophobic structure; and after the TEOS is hydrolyzed, formed polysilicic acid performs reaction with calcium hydroxide on the surface of concrete to form C-S-H gel as a secondary hydration product, so that pores of a concrete material are blocked, the surface compactness of the concrete is improved, entrance of CO2 and absorption of water are reduced to the maximum, and the water resistance ability and the carbonization resistance ability of the concrete are improved.
Owner:MAANSHAN TUORUI METAL SURFACE TECH

Multi-stage waterproof transformer substation with temperature and humidity regulation and control function

The invention relates to a multi-stage waterproof transformer substation with temperature and humidity regulation and control. The multi-stage waterproof transformer substation with temperature and humidity regulation and control comprises a box body, a supporting seat fixedly installed at the lower end of the box body, a waterproof system, a gap layer, a ventilation layer, a detection system and a control system, wherein the gap layer and the ventilation layer are arranged on the side face of the box body. The supporting seat isolates the box body from the ground. The waterproof system comprises a drainage top cover, a water level valve, a water storage tank, a water guide pipe and a spray head. A ventilation layer is arranged on the side wall of the box body and comprises a plurality of fans, exhaust holes and hole plugs. The detection system comprises a temperature detector A, a humidity detector A, a particle density detector A, a temperature detector B, a humidity detector B and a particle density detector B. According to the multi-stage waterproof transformer substation with the temperature and humidity regulation and control function, the control system controls the waterproof system and the ventilation layer according to the temperature, humidity and dust amount inside and outside the box body, effective water prevention is achieved, rainwater is collected to assist heat dissipation, a fan strengthens heat dissipation, and normal operation of the transformer substation is guaranteed.
Owner:符建雄

Connecting structure of caisson and partition wall and construction method of connecting structure

The invention discloses a connecting structure of a caisson and a partition wall and a construction method of the connecting structure. The connecting structure is characterized in that the connectingstructure comprises the fully-prefabricated caisson, the prefabricated partition wall and a floor slab. The floor slab comprises a floor slab prefabricating layer and a floor slab cast-in-situ layer.The caisson comprises a side plate and a bottom plate. The side plate of the caisson is in the same vertical plane with the prefabricated partition wall. The end part of the floor slab prefabricatinglayer is placed on the upper surface of the side plate of the caisson. A cast-in-situ reverse ridge is arranged at the position, located in the vertical plane, above the floor slab. The cast-in-situreverse ridge and the floor slab cast-in-situ layer are one-batch formed through cast-in-situ. The caisson is internally provided with a plate bottom rib and an additional plate surface rib. The platebottom rib and the additional plate surface rib enter the floor slab cast-in-situ layer through a bending anchor. By means of the connecting structure, application of a toilet caisson structure in anassembled building is enhanced, the waterproof effect of the assembled toilet caisson is improved, the use space of a toilet is enlarged, and requirements of industrialized production can be met.
Owner:CHANGSHA BROAD HOMES IND GRP CO LED

Double-layer lining shield tunnel deformation joint structure and shield tunnel

The invention discloses a semi-flexible and semi-rigid double-layer liner shield tunnel deformation joint structure. The structure comprises segments and linings, and laminated structural connection is formed between the segments and the linings in a non-deformation joint section; in a deformation joint section, the segments is continuously provided with N segment deformation joints at a predetermined length L at each interval, and N is an integer greater than or equal to 1; in positions corresponding to deformation joints of the segments, the linings are provided with lining small sections, lining deformation joints are arranged at the junction of the lining small sections and adjacent non-deformation joint sections, and the lining deformation joints and the segment deformation joints arearranged longitudinally in a staggered mode; and the invention further discloses a shield tunnel. According to the semi-flexible and semi-rigid double-layer liner shield tunnel deformation joint structure and the shield tunnel, the longitudinal rigidity of the deformation joints is higher than that of conventional flexible deformation joints, the opening amount of the segment joints can be reduced effectively, and the waterproof effect of a double-layer lining structure is improved; N segment deformation joints are arranged at the deformation joint sections to jointly share the opening amountof the segment joints; and the segments and the lining deformation joints are staggered in space, and the transverse shear can be resisted effectively to prevent slab staggering.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

Waterproof coiled material with sterilizing effect and preparation method thereof

The invention discloses a waterproof coiled material with bactericidal effect and a preparation method, belonging to the technical field of waterproof coiled materials. The waterproof coiled material comprises a base layer, a first bactericidal layer arranged on the upper surface of the base layer and a first waterproof layer arranged on the lower surface of the base layer, the upper surface of the first sterilizing layer is provided with a second waterproof layer, and the second waterproof layer is arranged on the upper surface of the base layer. A protective layer is provided on the upper surface of the layer, a second bactericidal layer is provided on the lower surface of the first waterproof layer, and a PE protective layer is provided on the surface of the second bactericidal layer. Wherein, the first and second waterproof layers are both SBS modified asphalt self-adhesive waterproof layers, and the first and second bactericidal layers are both TiO2/graphene modified polyurethane nano-bactericidal coatings. The waterproof coiled material can effectively avoid the growth of bacteria on the waterproof coiled material, and has a good bactericidal effect, and the preparation method has simple process, mild conditions and good application prospects.
Owner:安徽科徽联合认证有限公司

Waterproof construction method for open-cut semi-reverse construction method tunnel enclosing purlin node

The invention relates to a waterproof construction method for an open-cut semi-reverse construction method tunnel enclosing purlin node. The waterproof construction method comprises the following steps of before a foundation pit is excavated, firstly constructing an enclosure structure, cutting a groove below the bottom of an enclosing purlin to construct a tripod, and then laying a first waterproof roll; constructing the enclosing purlin and a support connected with the enclosing purlin, and continuously excavating the foundation pit downwards after the enclosing purlin is constructed; in there-construction stage, constructing first plain concrete, and laying a second waterproof roll; constructing a first lining wall structure, and correspondingly constructing second plain concrete; andlaying a third waterproof roll, and constructing a second lining wall structure at the position, corresponding to the first lining wall, above the enclosing purlin. According to the open-cut semi-reverse construction method tunnel enclosing purlin node full-wrapping waterproof construction method, the connection between the enclosing purlin and the enclosure structure can be firm, meanwhile, the waterproof rolls are prevented from being pierced by connecting steel bars, and the waterproof effect is improved.
Owner:SHANGHAI MUNICIPAL ENG DESIGN INST GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products