Building integral deviation correcting and raising lifting method and equipment thereof
A building and overall jacking technology, which is applied in the direction of building structure, construction, building maintenance, etc., can solve the problems of uneven settlement and accumulated errors, and achieve the effect of eliminating uneven settlement and accumulated errors
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The technical solutions of the present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0020] The principle of the method of the present invention is a new jacking method that combines the reinforcement of the building foundation static pressure pile 3 with the overall jacking technology, and only one set of jacking jacks 7 is needed in the overall jacking process. The jack 7 is installed in the middle of the upper and lower steel distribution beams, and the lower distribution beam is placed on the top of the pile foundation. The distribution beam passes through the finish-rolled rebar 10 on both sides, and the force is transmitted through the anchorage. The 10 parts of the finish-rolled rebar are connected to the pallet beam 2 anchored together.
[0021] Such as Figure 3a and 3b As shown, during the entire lifting process, the jack 7 lifts the upper distribution beam, and the distribution beam lifts the uppe...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 