[0028] Such as figure 1 Among them, an explosives lowering device, the lower end of the cylinder 1 is provided with a suction cup 3 for absorbing explosives 12, the center of the suction cup 3 communicates with the inner cavity of the cylinder 1, the cylinder 1 is provided with a piston 2, and the piston 2 is provided with a first pull The rope 4 is also provided with a limit block at the upper end of the cylinder body 1 to limit the position of the piston 2 .
[0029] In a preferred solution, an adjustable counterweight is provided on the barrel 1 to ensure that there is sufficient negative pressure adsorption force to make the suction cup 3 and the explosive 12 adsorb together and not fall off during the lowering process.
[0030] In a further preferred solution, there are multiple suction cups 3 . With the solution of multiple suction cups 3, even if some suction cups 3 fail, the explosive 12 will not fall off. The safety of blasting construction is further improved.
[...
Embodiment 2
[0037] On the basis of Example 1, the preferred scheme is as figure 2 , 4 Among them, the piston 2 is provided with a vent hole, the vent hole is provided with a plug 6, and the plug 6 is provided with a second pull rope 5. With this structure, it is convenient to pass air through the air hole on the piston more reliably, and it is beneficial to separate the suction cup 3 from the explosive after the explosive is placed in place.
[0038] In use, when the explosive 12 reaches the predetermined position, first pull up the second pull cord 5, so that the blockage 6 is released from the vent hole, the air enters the suction cup 3, and the suction cup 3 is separated from the explosive, and then the first pull cord is pulled up. Rope 4, whole explosive lowering device is recovered.
Embodiment 3
[0040] On the basis of Example 1, the preferred scheme is as image 3 Among them, the first stay rope 4 is connected to the first hoisting roller 10 around the pulley 9 located at the opening of the blast hole 7 . With this structure, the operator is prevented from directly operating at the opening of the blast hole 7, and the operation of remotely lowering the explosives can be realized, thereby further ensuring construction safety.
[0041] Wherein the pulley 9 is placed on the orifice of the blast hole 7 through the pulley support 8, and the first hoisting roller 10 is fixedly installed on the ground. Further preferably, the bottom of the first hoisting roller 10 is provided with a turntable, so as to be connected with different positions. The pulleys 9 are arranged in parallel. Through manual or electric operation, the operator is far away from the site to ensure the safety of construction. Preferably, both the pulley 9 and the pulley support 8 are made of plastic to fur...