Method and tool for retracement of floor slab hogging moment steel bars
A technology of negative bending moment reinforcement and floor slabs, which is applied in the direction of construction, building structure, and building materials processing, etc., can solve the problem of poor control of the thickness of cast-in-place concrete floor slabs, the thickness of the protective layer of steel bars does not meet the specification requirements, and the negative bending moment The mechanical performance of steel bars can not be fully exerted and other problems, so as to achieve the effects of convenient production, improved cast-in-place quality and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] Embodiment 1 of the present invention: a method for recalling the negative moment reinforcement of a floor slab. Firstly, concrete is poured on the floor. The floor negative moment reinforcement in the rest of the concrete is matched and connected, and then the floor negative moment reinforcement callback tool is straightened and vertically erected on the floor formwork so that the negative moment reinforcement is returned to the original design position. After 10s to 30s, the floor is The negative moment reinforcement callback tool is tilted to disengage the rest of the floor negative moment reinforcement, and then taken out from the concrete to realize the callback of the floor negative moment reinforcement. In this embodiment, the distance between the floor negative moment reinforcement and the design elevation of the floor template The concrete thickness of the floor slab is consistent (excluding the concrete protective layer of the negative moment reinforcement of t...
Embodiment 2
[0020] Embodiment 2 of the present invention, a method for recalling the negative moment reinforcement of the floor slab. Firstly, concrete is poured on the floor. Let the floor negative moment reinforcement in the rest of the concrete be connected together, then straighten the floor negative moment reinforcement callback tool and stand vertically on the floor formwork to make the negative moment reinforcement return to the original design position. After 10s to 30s, put the The floor negative moment reinforcement callback tool is tilted to separate the rest of the floor negative moment reinforcement, and then taken out from the concrete to realize the callback of the floor negative moment reinforcement. In this embodiment, the distance between the floor negative moment reinforcement and the floor formwork design elevation Consistent with the concrete thickness of the slab (excluding the concrete protective layer of the negative moment reinforcement of the slab).
[0021] A ki...