Method for cultivating giant salamander in freshwater lake region
A salamander and freshwater lake technology, applied in the field of salamander breeding, can solve problems such as taking 2.5 to 3 years or even longer to arrive, asynchronous growth of male and female plants, and long cultivation cycle, and achieve the best social value and Effects of economic value, tight flesh, and docile temperament
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0024] Build aquaculture pond group and water regulation pond in Datong Lake District, Yiyang City, Hunan Province. The aquaculture pond group includes 10 aquaculture ponds of 5㎡, 15㎡ and 20㎡ each, and dig a deep water well 80m away from the aquaculture pond group. , each culture pond in the culture pond group is built as a cavity structure with three sides closed and one side open, the opening direction is oblique 45°, and the top of the opening part is covered with an escape net, and the inner side of the cavity is pasted with glazed tiles On the surface, after the breeding pond is built, clean the cement and building residues with clean water, and use 0.05kg / m3 quicklime water to wash and disinfect. The washing time is 10 minutes. After washing, the lake water is used to soak for 2 months, and then the lake water is drained. And use 0.08kg / m3 quicklime water to disinfect for 10 minutes, and clean it after disinfection.
[0025] The deep well groundwater and Datong Lake wate...
Embodiment 2
[0032]Build a culture pond group and a water regulation pond in the lake area of Lianliang Lake in Hubei Province. The culture pond group includes 5 culture ponds of 5㎡, 15㎡ and 20㎡ each, and a 120m deep well is dug at a position 30 meters away from the culture pond group. Glazed tiles are used to veneer the inner side of the breeding pond cavity. After the breeding pond is built, the cement and building residues are cleaned with clean water, and rinsed and disinfected with 0.08kg / m3 quicklime water for 10 minutes. Soak the lake water for 45 days, then drain the lake water and disinfect it with 0.08kg / m3 quicklime water for 10 minutes, then clean it after disinfection.
[0033] The deep well groundwater and borrowed grain lake water are introduced into the water regulating pool at a ratio of 1:3, and oxygenation, filtration, purification, pH adjustment and water temperature raising operations are carried out in the water regulating pond to ensure that the dissolved oxygen in ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com