Construction method of internal support structure supported by steel sheet piles
A supporting structure and construction method technology, applied in foundation structure engineering, sheet pile walls, excavation, etc., can solve the problems of unclosed foundation pit, weak integrity and low rigidity of purlins and internal support structures, etc., and achieve good integrity , good support effect, high rigidity effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] The dimensions of the pipeline foundation pit are: width about 5m, length about 265m, foundation pit depth 6.5m. It is supported by hot-rolled Larsen SPU-IV400x170 steel sheet piles, L=12m. The columns and beams of the rigid frame are all made of hot-rolled H-shaped steel of HM390x300x10x16 type. The inner support rigid frame adopts a layer of beams, and the horizontal span of the rigid frame is 3.2 meters.
[0040] A construction method for an inner support structure supported by steel sheet piles, the specific steps are as follows:
[0041] 1) Weld the hot-rolled HM390x300x10x16 type H-shaped steel on the outside of the Larsen U-shaped steel sheet pile. The carbon dioxide gas shielded welding method is used for welding, and the outer side is intermittently welded. The rate reaches about 60%, and the height of the welding foot is 8mm. The head of the steel sheet pile is 1.2 meters higher than the H-shaped steel, the top of the H-shaped steel is welded with a steel p...
Embodiment 2
[0048] Dimensions of foundation pit for sewage interceptor box project: width about 6.6m, length about 80m, depth of foundation pit 8m. It is supported by hot-rolled Larsen SPU-IVw600x210 steel sheet piles, L=12m. The columns and beams of the rigid frame are all made of hot-rolled H-shaped steel HN700x300x13x24. The inner support rigid frame adopts two layers of beams, and the horizontal span of the rigid frame is 3.6 meters.
[0049]1) The U-shaped steel sheet pile and the H-shaped steel are welded. The carbon dioxide gas shielded welding method is used for welding, and the outer side is intermittently welded. The ends of the steel sheet piles are welded for 800mm, and then welded every 300mm for a length of 400mm, and the welding rate reaches about 60%. , The height of the solder feet is 8mm. The head of the steel sheet pile is 1.2 meters higher than the H-shaped steel, the top of the H-shaped steel is welded with a steel plate, and bolt holes are reserved on the steel pla...