A kind of permafrost filling construction method
A construction method and frozen soil technology, applied in roads, roads, buildings, etc., can solve problems such as increased water content of roadbed filler, roadbed frost heave, road and railway transportation hazards, etc., to achieve the effect of ensuring road quality and preventing roadbed frost heave
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0021] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Apparently, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0022] A flow chart of a permafrost filling construction method, the specific construction process is:
[0023] (1) Construction preparations: before subgrade construction starts, on-site investigation and verification shall be conducted on the basis of a comprehensive understanding of design requirements and design disclosure; temporary works shall be constructed to meet normal construction needs;
[0024] (2) Measurement and stakeout: on-site recovery and fixed route, including retesting...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com