Intelligent engineering construction project management system

An intelligent management system and technology for construction projects, applied in the field of engineering construction project management, can solve problems such as slow transfer methods, cumbersome process inspections, rough construction plans, etc.

Inactive Publication Date: 2016-03-02
吕曼
View PDF2 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the closed management system, extensive organizational management, rough construction plan, complex operation process, cumbersome process inspection, numerous true and false materials and slow transmission methods are no longer suitable for the requirements of the new situation, and must be reformed and innovation
[0004] At present, in the existing engineering and construction project management, construction, design, supervision, owners, and the industry department in charge and the project department (director

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent engineering construction project management system
  • Intelligent engineering construction project management system
  • Intelligent engineering construction project management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0120] The intelligent management system for engineering construction projects disclosed in the present invention will be explained in detail below. The intelligent management system of engineering construction projects disclosed in this example, such as Figure 13 , Figure 14 As shown, it includes a server 1 and several clients 2; the server 1 stores an engineering model 11, and the client 2 is provided with a functional module 21. The intelligent management system of this engineering construction project is oriented to all construction managers, such as construction units, owners, supervision units, industry management departments, etc.; Can perform corresponding operations within the scope of authorization.

[0121] The construction unit is the main body of the project construction, and is mainly responsible for the formulation of the construction plan, planning, organization and implementation, and self-inspection and control of progress, safety, quality, cost, and envi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

In order to solve the problems mentioned in the prior art, the invention provides an intelligent engineering construction project management system. The system comprises a server and a plurality of clients. The server stores engineering models. Each client is equipped with a cost management module, a progress management module, a security detection module, a field measurement module, a field professional quality inspection module, and a field test and detection module. The engineering construction project management system disclosed by the invention can reflect the result of inspection timely, accurately, truly and visually, and dispose problems existing in engineering construction timely. The problem that dispute may be easily caused as the construction unit, design unit, supervision unit, owners, the industry department in charge and the project department (director's office) do not cooperate with one another, each manage one section and do not share information and the result of inspection is not transparent is solved effectively.

Description

technical field [0001] The invention relates to the field of engineering construction project management, specifically including engineering construction project management in the following fields: highway engineering, water transport engineering, railway engineering, municipal engineering, housing construction engineering, water conservancy engineering and the like. Background technique [0002] Engineering construction has brought about earth-shaking changes in cities and rural areas, especially the development of expressways and high-speed railways, which has greatly shortened the distance between cities and people. The speed, convenience and comfort of highways and railways left a deep impression on people. However, the development and application of Internet technology has made human society more accessible and omnipotent. Under the current new situation of mass entrepreneurship and innovation, the application of Internet + makes life more convenient, improves the work...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/08
Inventor 吕曼吕柳明
Owner 吕曼
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products