Equipment and Construction Method for Shallow Burying and Deep Pipe Jacking to Control Ground Structure Deformation
A technology of structural deformation and construction method, which is applied in the direction of mechanical equipment, pipeline laying and maintenance, pipes/pipe joints/pipe fittings, etc., can solve the problems of large ground structure deformation, reduce the amount of backfill, obtain social benefits, and reduce construction costs. The effect of excavation volume
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Such as Figure 1-2 As shown, the equipment for controlling the deformation of the ground structure provided by the present invention for shallow-buried and deep pipe jacking includes the sleeper 2 arranged on the front side of the caisson background wall 1 in the caisson, and the sleeper 2 is provided with several groups of jacking picks 4 An iron sleeper 3 connected at one end, the other end of the top pick 4 is fixedly connected with a top iron 5, and the top iron 5 is placed on the side wall of the concrete pipe 6, and the concrete pipe 6 is provided with a grouting hole 7. The concrete pipe 6 is set at a distance of 1.5-3m from the ground. The background wall 1 has a thickness of 50cm, an outer diameter of 5m, and a height of 3.5m. In this embodiment, there are preferably three sets of jacks 4 with a specification of 200T. The diameter of the concrete pipe 6 is in the range of 1.4-3.6m, preferably 3.5m. After the concrete pipe 6 is in place, the construction per...
Embodiment 2
[0032] In this embodiment, the present invention provides an equipment construction method for controlling ground structure deformation by using shallow buried and deep pipe jacking, including the following steps:
[0033] Step 1, laying out the excavation line in the original landform 11 according to the design, and digging down the caisson and the receiving pit 9 according to the set position and the set depth of the excavation line;
[0034] Step 2, use the total jacking force calculation formula (1) to select equipment,
[0035] P=n×G×L……(1);
[0036] In the formula, P-total jacking force (KN), G-unit length pipe body deadweight (KN / m), L-jacking total length (m), n-soil quality coefficient, n is selected 2 among the present embodiment, and selection range: 1.5~2, after calculation, the total jacking force P=25KN / m×55m×2=2750KN.
[0037] According to the calculation formula of the jacking force, the jacking equipment is three sets of 200T jacking picks, one of which is a...