A technology of support and guide, pile foundation, applied in sheet pile wall, foundation structure engineering, construction, etc., can solve the problems of complicated and difficult moving and fixing process, inability of piling ship to be driven, and heavy structure of pile driving frame, etc. Construction cost and the effect of improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Such as figure 1 and figure 2 As shown, the pile foundation supporting and guiding clamp of the water piling of the present invention includes a joint seat 1, an arc-shaped fixed arm 2, an arc-shaped movable arm 3, an arc-shaped movable arm driving cylinder 4 and an array of support rollers 5. The joint seat 1 is welded The box-shaped body of the structure, the longitudinal ends of the upper and lower plates of the box-shaped body extend outwards to form a front concave shelf 11 and a rear concave shelf 12 respectively, and the left end of the arc-shaped fixed arm 2 and the left end of the arc-shaped movable arm 3 are respectively embedded in both sides of the front concave shelf Inside, the left end of the arc-shaped fixed arm 2 is fixedly connected with the left side of the front concave shelf 11, and the left end of the arc-shaped movable arm 3 is hinged with the front concave shelf 11 right side by a hinge pin 31. The rear recess 12 is embedded in the front end of...
Embodiment 2
[0031] In this embodiment, a roller frame 8 is added, and the two ends of the support shaft 51 are supported in one end of the roller frame 8 , and the other end of the roller frame 8 is fixed on the inner side of the arc-shaped fixed arm 2 or the inner side of the arc-shaped movable arm 3 . For supporting and guiding smaller diameter pile foundations 7 . The rest of the structure of this embodiment is the same as that of Embodiment 1.
[0032] A method for supporting a guide clamp using a pile foundation driven by water piling, comprising the following steps:
[0033] 1) The pile foundation support guide clamp is installed on the front end of the boom 101 of the truck crane 100
[0034] Install the rear end of the pile foundation support guide clamp on the front end of the boom 101 of the truck crane 100 from which the hook device has been removed, and connect the hydraulic oil pipe and the electric control signal line of the arc movable arm drive cylinder 5 to the hydraulic...