Calculation Method of Vertical Deformation of Soil Caused by Ground Access Shield Tunnel Construction
A technology for vertical deformation and tunnel construction, which is applied in tunneling, calculation, earthwork drilling and mining, etc. It can solve problems such as inconsistent calculation results, failure to consider the angle between the shield axis and the horizontal plane, and engineering safety hazards.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0111] The technical scheme of the present invention will be further described below in conjunction with the accompanying drawings of the description:
[0112] Such as Figure 1~4 As shown, the present invention provides a calculation method for the vertical deformation of the soil caused by the construction of the ground access type shield tunneling method. Since the present invention truly considers the shield propulsion direction and the additional thrust of the front of the excavation surface, the friction of the shield shell, and the additional thrust of the shield tail. The grouting pressure has a certain angle β with the horizontal plane (see figure 1 b, take up as positive and down as negative). The calculation formulas for the vertical deformation of the soil caused by the additional thrust at the front of the excavation face, the friction force of the shield shell, the additional grouting pressure at the shield tail and the loss of the soil are proposed respectively...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


