Calculation method for additional loads of adjacent underground pipelines caused by ground access shield tunneling
An additional load, access type technology, applied in the direction of calculation, design optimization/simulation, instrument, etc., can solve the problem of calculation result error and so on
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0132] The specific implementation manner of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0133] Such as Figure 1~5As shown, the present invention provides a specific embodiment of the calculation method for the additional load adjacent to the underground pipeline caused by the construction of the ground access shield tunnel, in order to solve the problem of the size of the additional load adjacent to the underground pipeline caused by this special working condition, and to provide future on-site construction And theoretical research provides the basis for the formula. This patent considers the angle β between the shield axis and the horizontal plane (that is, the change in tunnel depth), and proposes the soil mass caused by the frontal additional thrust, shield shell friction, additional grouting pressure, and soil loss. Additional stress calculation formula; when calculating the additional stress of the pipeline, s...
PUM